Laserfiche WebLink
h ■. ■ <br />m <br />t . <br />■■..< ' ? rfe':??^i-r=--. "• <br />Tv mmm <br />TOE PLANNING COM^^:SSICN ACTION SESSION - August 4, 1975 Page 3 <br />Curtis mxved. Brad Van Nest seconded, that this be tabled <br />I6r two weehs since some of the newer members were un­ <br />familiar with this proposal, and in the two weelc interim <br />each menber of the Plamiing Connission visit and study the <br />Eisii^r Property plan and cone bade for discussion and <br />reoonneiidation. <br />Ayes (5), Nays (0). <br />Roger Patch's piblic hearing was opened again, and since <br />there was no testimony. Brad Van Nest clo^ the hearing. <br />Iknlap moved, Hannah seconded, to recomnend to Council, <br />appremd of the subdivisions and that there be a cash <br />paifc dedication of 101 of raw land value. <br />Henry Mbich presented the Howard Larson proposed on-site <br />disposal plans, and stated that the proposed structure ^ <br />location meets all tiie setback requirements, with this. <br />Brad Van Nest moved, Diane Dunlap seconded, to reconroend <br />to the Council, approval of this variance for lot size <br />and lot widtii subject to the fbllowing conditions; that <br />the septic system be constructed in accordance with the <br />approval of the Village Engineer, as laid out hy Gene <br />luacok $ Associates, and that no other variances be re- <br />ouired. <br />Ayes (S), Niys (0). <br />After reviewing and discussing the comments of Good Shep­ <br />herd and the piblic, <br />ROGER PA30I- <br />FUBLIC HEARING <br />1330 6th Ave. N. <br />miARD LARSON mf oN-srxE Di <br />PLANS <br />1465 Long Lake Blvd. <br />Van Nest moved, Hannah seconded, to table this for two <br />weeks. He asked that the staff coummlcate by letter, <br />lx <br />were <br />able ooncm to the meibers: also, the Plannins Commissi <br />would like to see plans submitted as to the intended <br />usage including useage of the private road to the <br />parsonage. On this plan it should be indicated what people <br />would be using ^ parking lot in excess of dixrch parking, <br />the lamber of patkim spa^ available and tiieir size <br />and location on the lot to see if zoning requirements <br />SHEPHERD urn] <br />f-OOND. OSB <br />DAY ACTIVITY CENTER <br />S74S Shoreline Dr. <br />Ayes (5), Jfcys (0).