My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-29-1979 Planning Packet
Orono
>
Planning Commission
>
1979
>
10-29-1979 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 1:40:46 PM
Creation date
2/15/2023 1:39:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 18, 1979 <br />Mr. Robert Pope <br />Mr. David Delaney <br />#491 First National Bank of Navarre <br />Page 2 <br />2. The subdivision will be made at the 250- zoning line requiring <br />no zoning changes. <br />3 The ^Sis'rlquir^'rvrrLJertrom <br />?egC?nd 0- se?Lck l'w!u rlconunend approval o£ the variance <br />r€?r;S <br />ififsl -rcrnrertuauj approved. <br />4. The loading berth is to be relocated for pull-in/pull-out <br />configuration. <br />5. The drive-in paving and curbing will be a.'.tered to provide <br />emergency, truck and auto bypass. <br />6 I have been told that the revenue bonding papers appear to ^ <br />Ik oiderTanf^hat a public hearing can be called as soon as the <br />published notice allows. <br />REQUIRED INFORMATION <br />Plan Review - Ten (10) copies of revised site.planPlan Review Changes, etc. Due by Wednesday, October 24, 1979 <br />for Council meeting October 30, 1979 <br />Subdivision - <br />Across pripL?yf ^Mso^IubdivtsLn application fee <br />of $170-00. Due by Monday, October 22, 19^9 for rev <br />by Planning Commission on October 29, 1979. <br />Building Permit - (After Council Approval) <br />Three (3) sets final plans and specifications, energy <br />calculations, etc. <br />Two (2) copies Flowage and Conservation Easement with <br />iegai description covering all area below 940 contour <br />on Coulter survey. <br />SAC, sewer and water charges (5 unit building less <br />existing credits) (4 X SAC; 4 X $225 sewer connection: <br />3 X $870 water units) <br />Park dedication fee $500/gross ac X 1.34 ac = $670.00
The URL can be used to link to this page
Your browser does not support the video tag.