Laserfiche WebLink
PLANNING COMMISSION MEETING <br />June 1, 1979 # 4 7 9 <br />Planning Commission directed staff to define for applicant the <br />accepted method of determining the 200’ width at building site. <br />Mr. Van Eeckhout was advised to make the following changes in <br />the sketch plan: <br />1. Realign lot lines to satisfy the 200* width at building <br />site. <br />2. Wetlands are to be combined with adjacent lots. <br />Staff note, June 1, 1979 <br />Method for determining lot width at building site. <br />The new plans meet the requirement set forth at our last meeting. <br />The applicant must supply the following to proceed with his <br />preliminary application: <br />1. List 7 property owners within 300'. <br />2. Topographic map of plat area. <br />3. Required septic testing for each of the seven lots. <br />4. Certificate of survey. <br />5. Report from Hennepin Soil Office.