My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-11-1979 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1970-1979
>
1979
>
06-11-1979 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 1:39:58 PM
Creation date
2/15/2023 1:38:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILLIAM D SCHOELL <br />CARLISLE MA050N <br />JACK T VOSLER <br />JAMES R ORR <br />HAROLD E OAHLIN <br />LARRY L HANSON <br />RAYMOND J JACKSON <br />WILLIAM J BREZINSKY <br />JACKE GILL <br />RODNEY B. GORDON <br />THEODORE 0 KEMNA <br />JOHNW EMOND <br />KENNETH E. ADOLF <br />WILUAMR ENGELHAROT <br />BRUCE C SUNOING <br />R. SCOTT HARRi <br />DENNIS W SAARI <br />GERALD L BACKMAN <br />SCHOELL & MADSON.INC. <br />ENGINEERS AND SURVEYORS <br />(612) 936-7601 • SO NINTH AVENUE SOUTH • HOPKINS. MINNESOTA SS343 <br />OFFICES AT HURON. SOUTH DAKOTA AND OENTON. TEXAS <br />May 25, 1979 <br />City of Orono <br />c/o Ms. Jecume Habusthr Zoning Administrator <br />1335 Brown Road South <br />Crystal Bay# Minnesota 55323 <br />CiTV OF ORONO <br />Subject: Smerling vs. Holzer Property at <br />2683 Casco Point Road. <br />Dear Ms. Mabusth: <br />Pursuant to a request from Hr. James Gilbert* Attorney for the Smerling*s* <br />we herein wish to indicate our opinion related to the need for a retaining wall <br />on the Holzer Property. <br />After having viewed the site* it is our opinion that the wall constructed <br />on the Holzer site is not needed for erosion control. The Holzer site is at <br />the crest of a hill and drainage runs in all directions. If it was the inten <br />tion to retain drainage from the Holzer front yard (lakeside)* and pipe this <br />drainage directly to the lake* it could have been done much less offensively <br />than building a large retaining wall. Simple site grading on the yard and <br />construction of a sump to collect drainage vrould accongilish the same result <br />as relates to drainage. The sump would have a pipe discharging doim to the <br />lake. <br />Very little* if any* drainage ran off of the Holzer front yard to the <br />Smerling Property. That is obvious by examining the site. We understand <br />that the conflict relates to the wall* its height* placement and obstruction <br />of the view. In our engineering opinion the final determination concerning <br />the wall ought to be based* on that* and not the erosion issue since the drainage <br />could be accomplished without a 56 inch high wall. <br />Please advise as to .any questions. <br />Very truly yours* <br />JROrr:bk ^ <br />cc: Mr. 6 Mrs. Smerling <br />Mr. Jim Gilbert* Attorney <br />Meshbesher* Singer & Spence* Ltd <br />SCHOELL 6 MADSON* INC. <br />\ <br />/VO. <br />\ <br />1
The URL can be used to link to this page
Your browser does not support the video tag.