My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-07-1979 Planning Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1970-1979
>
1979
>
05-07-1979 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 12:39:48 PM
Creation date
2/15/2023 12:39:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF A PLANNING COMMISSION MEETING HELD ON MAY 7, 1979 <br />Page 3 <br />■RSEN <br />lur Park Rd. <br />[ON/VARIANCE <br />UVE <br />th Shore Dr. <br />When brought back before the Planning Coinmission, <br />Mr. Touve decided to remain with his original <br />request. Wilson moved to recommend denial of the <br />variance based on the assumption that an access <br />can be obtained to County Road 19 for a driveway <br />and that the garage can then be built on the east, <br />however, should the access be denied the Planning <br />Commission will reopen ” reconsider the variance <br />request. Motion seconded by Hannah. <br />During discussion, Wilson requested that the <br />Minutes record that the Planning Commission was <br />concerned with the safety of the additional access <br />on County Road 19, but the recommendation was made <br />after considering the neighbor's objections. <br />Vote: Ayes (4), Nays (0). Motion passed unanimously. <br />Mr. Johnston was present. Also present were Jean <br />and Burt Corwin representing the Hendel properties. <br />Mabusth referred to the Septic Inspector's memo of <br />May 7, 1979 in which he stated that Lot 2 would <br />require a mound system and Lot 3 would require a <br />standard drainfield. Tn regards to Lot 1, pending <br />a final determination of the location of the existing <br />system, it may be necessary to realign lot line to <br />preserve the 2-acre dry buildable requirement. Testing <br />for the alternate drainfield also needs to be done. <br />In discussion regarding the road it was determined <br />that it would be 50' but would not be subtracted from <br />the property as the overall density has been met. <br />It was also decided that the temporary access could <br />not be used once there is a fourth residence. General <br />consensus seemed to favor a private road graveled to <br />City specifications. <br />Adams moved to recommend preliminary approval of the <br />three lot subdivision contingent on: <br />1. Outlet platted 50' wide from Willow Drive to the <br />Hendel property. On a temporary basis, the existing <br />driveway will be used until more than three residences <br />are served. Road placement and type of road will be <br />determined by the City Engineer and the Developer. <br />* <br />2. Written agreement from Mrs. Hendel to vacate the <br />existing underlying easement through Lot 3. <br />JAMES TOUVE <br />4196 North Shore Dr. <br />VARIANCE <br />(#476) Cont. <br />HARRISON JOHNSTON <br />925 Willow Dr, So. <br />SUBDIVISION <br />(#457)
The URL can be used to link to this page
Your browser does not support the video tag.