Laserfiche WebLink
K' <br />• <br />Jaiinne Zoning idnlnlstrator of City of Orono. <br />fti or about May 3^19^ I was notified of construction being <br />done on the property of Cortlen ^outier of 2h80 Casco Point Rd« <br />No perait had been issued by the inspector at this time* <br />When I arrived at the scene* the blodc^fork had alreqdy <br />collapsed due to Hilly early back fill, rain the night before <br />and non oonforming (8) eight inch blocks* <br />When I talked to Cloutier about the coUaj-sed structure and <br />failure to get a building perait* he stated to me that it was a y <br />ground level boathouse* and that the material cost would not exceeed <br />$500*00( ^ive hundred Dollars). <br />I went to several of the neighbors* among them Wilbur and Kaurine <br />^‘ndersen at 3555 fVederick St* and they said they would have <br />no objection to a ground level boat house* <br />With this I issued a pvnoit # 2495 for $500.00 ( Five hundred Dollars) <br />In materials at a fee of |5*00( five dollars)* <br />When the concrete BLook work was finished* eos^rising ofl2 inch Elock* <br />and the boat house was capped off, I cheeked it out and assumed that <br />it was coaqjlete as per our agre inent with Kr. tSLoutier* the <br />rate of fee for permit paid^and the negotiation I had with the Neighbors <br />Former ^Uilding Inspector <br />Notarized! <br />June 25. 1980 <br />cMaurine e/foJexien <br />NOlAal . .li * MiAeflSOfA <br />COUNlf <br />My cowwiimon 4. 1914 <br />■I <br />‘^^NoUryi <br />A.