My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-1982 Planning Packet
Orono
>
Planning Commission
>
1982
>
04-19-1982 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 11:01:09 AM
Creation date
2/15/2023 10:59:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />#671 Schlee Builders Inc. <br />April 15. 1982 <br />page 11 <br />3. <br />b.) Replacing existing line in Blaine & Crystal <br />Place (LS-6 discharge) (est. cost $65,000) <br />c.) Rerouting LS 7 from LS-6 direct to LS-5 by <br />construction of new forcemain in Co. Rd, 19 <br />(est. cost $90,000) <br />Staff proposes redirection the sewers in this <br />development directly north to Northern Ave. and <br />Togo Rd. Advantages: <br />a.) bypasses LS-6 and capacity problems <br />b.) allows City to bypass Blaine-Crystal bottle <br />necks <br />c.) requires construction of new 1* .e to Togo Rd. <br />which would also be used for sewering Northern <br />Ave, (est. cost $90,000) <br />d.) allows sewering of Northern Ave. as part of <br />this project. <br />e.) requires some deeper sewer construction on <br />this plat, and some line oversizing to handle <br />City bypass <br />4. Sewer Conclusions <br />a.) The sewer must run north, not south. <br />b.) Off site improvements are required to accomodate <br />this development and are chargeable to it, <br />whether the lines run north or south. <br />c.) There are advantages to the City in constructing <br />the new bypass system as part of this develop <br />ment. <br />d.) The costs of the north line could be divided <br />between this development, other areas directly <br />benefitted (ie: Northern Ave) and other de <br />velopment south of LS 6 which is otherwise <br />limited by the existing system. <br />VII. WATER <br />This development will include public watermain ex <br />tensions within the plat. Sufficient capacity is <br />available. The only criteria is line sizing and <br />looping for proper distribution. <br />1. The Theater property was assessed for 19 commercial <br />water units, equivalent by cost to 24 residential <br />units.
The URL can be used to link to this page
Your browser does not support the video tag.