My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-1982 Planning Packet
Orono
>
Planning Commission
>
1982
>
04-19-1982 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 11:01:09 AM
Creation date
2/15/2023 10:59:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#671 Schlee Builders Inc <br />April 15, 1982 <br />page 8 <br />4. Lot Sizes <br />a.) Compare: <br />LR-IC <br />LR-lC-1 PRD <br />lot area <br />SF <br />lot width <br />FT <br />Smallest proposed 7,625 (.175; <br />Largest proposed 16,750 (.385) <br />Average lot_ _ _ _ _9,565 (.22) <br />21,780 U50) loo (single family) <br />14,520 (.33) Variable (reg's attached] <br />6(r <br />175 <br />60-70 <br />Average existing 10,690 (.245) 50-75 (Nav. Hts. Area) <br />b.) Proposed setbaclcs are all equal to the LR-IC <br />requirements of 30 ft front and rear; 10* <br />side. <br />5. Layout Conclusion <br />a.) Leaving the layout as proposed does not ma)ce <br />good use of the dry buildable land on Outlet <br />A, and it leaves this area open to future <br />commercial development pressures no matter <br />how the ownership is arranged. <br />b.) The best solution is to use up or plat the <br />Outlot A area now, either by extending lot lines, <br />spreading units or even allowing a few additional <br />units. <br />c.) The "Park ” area should be redesignated as <br />an Outlot. <br />IV. DRAINAGE AND GRADING <br />The grading and drainage plan shows extensive wor)c <br />required to accommodate any development, especially <br />on the Theater site. All site drainage will be directed, <br />as now, to the existing wetland which will be utilized <br />as a retention pond. <br />1.Drainage plans and calculations must be approved <br />by the City Engineer and MCWD. MCWD staff have <br />done a preliminary review per their 4-13-82 letter. <br />Some outlet changes may be required. <br />2.There are some existing drainage problems along <br />the railroad trac)c and Northern Avenue which may <br />be able to be improved along with the wor)c in <br />this plat. <br />3. Drainage Conclusions <br />Other Than standard engineering reviews and standard <br />construction practices and requirements, there <br />should be no drainage problems or issues with <br />this proposal.
The URL can be used to link to this page
Your browser does not support the video tag.