Laserfiche WebLink
^ . <br />EXHIBIT K <br />Jeanne A. Mabusth, Zoning Adnlnistrator <br />Alan P. Olson, City Planner <br />March 8, 1982 <br />*672 New Life Bible Church, 830 Old Crystal Bay Road <br />Conditional Use Permit <br />This application has two main issues requiring decisions by <br />the Planning Commission and Council: <br />Is the proposed use and location consistent with Conditional <br />Use Permit requirements and standards for Churches per <br />34.022? If yes, then more detailed building and site plans <br />can be reviewed at a later date. There does appear to be <br />sufficient land available to meet any and all building and <br />zoning code requirements without considering any performance <br />standard variances. <br />I <br />B) If the site and location is approvable for the proposed <br />Church use, then a question exists as to whether or not <br />municipal sewer and water connections should be allowed. <br />The land is in the RR>1B Rural Service Area. The lot size exceeds <br />the 2.0 acre minimum requirement of the zoning code and comprehensive <br />plan. There is sufficient area available for on-site sewer and <br />water, but septic site evaluation has not been done yet. <br />A municipal sewer stub was provided to this land in 1967 when <br />these services were extended for the Orono High School. The <br />water main is on the west side of the road: There are no water <br />stubs on this property despite the lateral assessment levied. <br />The land was assessed for sewer and water as follows: <br />TOTAL PARCEL CHURCH LAND <br />AFTER DIVISION <br />THEIS REMAINDER <br />AFTER DIVISION <br />sewer main 305.5* <br />($5.99/ft) <br />$1,829.95 300* * $1,797.00 5.5 $32.95 <br />sewer service <br />(each) <br />59.62 59.62 0.00 <br />water main 967.5* <br />($7.79/ft) <br />$7,536.83 <br />$9,426.40 <br />300 $2,337.00 667.5*« $5,199.83 <br />^4719^.32 ^,232778 <br />The MUSA/MSSR line has been legally defined as running do%m the <br />center of Old Crystal Bay Road. This land is outside the Urban <br />Service Area. The Comprehensive Plan excludes rural land such as <br />this from municipal sewer or water service, or from urban-type <br />development. Rural Sewage Treatment Policy #7, pg. CMP 6-14 says: