My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-19-1976 Planning Packet
Orono
>
Planning Commission
>
1976
>
07-19-1976 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:49:26 PM
Creation date
2/9/2023 3:47:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br />V <br />. I <br />% <br />•• <br />t' <br />! * <br />i ^ <br />m <br />TO:Dick Benson, City Administrator <br />FROM: <br />DAJI:: <br />SURTTiCr: <br />Hank Muhich, Building fi Zoning Administrator <br />June 17, 1976 <br />George Hanson - Big Island. Variance. <br />Lot area - Lakeshore setback <br />Street setback - Hardcowr restrictions <br />•' '.VO i <br />•• <br />JL : j <br />Mr. Hanson is requesting the above variances to build a new home to replace <br />the one that was recently completely destroyed bv fire on Lot F. This nro- <br />posal would be on improvement to the previous situation in that the new <br />location is further from the lakeshore. <br />There should be some concern of precedence on Big Island, however. Mr. <br />Hanson also owns lots G and 3 which consist of an additional 17,771 sq. ft. <br />We could also consider vacating the street if acccs:. to other properties <br />would not be obstructed. Tlic streets ccMisist of an area of approximately <br />9,000 sq. ft. If all this area were combined, then uould be a total of <br />approximately 55,000 sq. ft. (87,120 sq. ft. requin I). We could, navevc r, <br />maintain the required 75' setback from the shoreline. These are only sug <br />gestions since I have never been on the island. A site inspection will be <br />necessary before determining a reasonable solution. <br />The builder did indicate that the existing dram field for the septic system <br />is presently located in the street area. <br />PLA'iNINV. OOMMISSION MlilTINf. - Jiuie 21, 1076 <br />Suf^ested boat transportation be arranged for PC menhers to make site inspection <br />before determining decision on proixisal. <br />Julv 8, 1976 <br />As of this date, I have not l)Oon able to arrange transportation for a (momn <br />of the PC mcmlKirs. <br />« <br />«
The URL can be used to link to this page
Your browser does not support the video tag.