Laserfiche WebLink
Table 7.18 Priority CIP Projects <br />iWS ■mrtaiOiWUlsn <br />Carman Bay <br />Pond CB-Q3 (1)19,000 Pond SB^16(I)15,000 <br />Roadside techniques along <br />Blaine Ave in subdlstilcts <br />CB-0 and CB-2 (II) <br />9.000 Ravine stabilization In <br />subdistrict LC-23 (1)108.000 <br />Pond CB-Q9 (1)20.000 Pond LOQ1000 (1)33.000 <br />Forest Lake Pond SB-Q9.1 (II)110.000 <br />Ravine stabilization in <br />subdistrict FL-19 (1)63.000 Ravine stabilization in <br />subdistrict SB-9 (II)135,000 <br />Pond FL-Q15(I)18,000 PondSB-Q5 (II)13.000 <br />Roadside techniques In <br />subdistricl FL-0 (II)18,000 Ravine stabilization in <br />subdistrict SB-S (II)68.000 <br />Ravine stabilization in <br />subdistrict FL-20 (1)108,000 Pond 3B-Q11 (II)23.000 <br />Maxwell Bay Roadside techniques along <br />Bayside Road (II)?0.000 <br />Pond MB-Q7 (II)47.000 Roadside techniques along <br />Tonkawa Road (II)15,000 <br />North Arm t inager Lake <br />Ravine stabilization In <br />subdistrict NA-0, extending <br />SW from node 500 (1) <br />72,000 Study flow at top of sub <br />district TL-11/node 901 (1)19,000’ <br />Pond NA-09 (1)47,000 Roadside techniques along <br />Browns Road S (II)27,000 <br />Ravine stabilization at north <br />end of subdislrict NA-0, near <br />pond NA-Q8000 (II) <br />72.000 Roadside techniques along <br />Shoreline Drive (II)27,000 <br />Ravine stabilizaUon at north <br />end of subdistrict NA-0 (II)72.000 <br />1 <br />TOTAL 1.188,000 <br />Ji <br />lor ravfn* •taUbattwi. cotts V* tsomaies only MMd on $90 ptf kiMr foor <br />* Study costs of S4000 ptr ytar lor (bur y«an. plus MSal pufchast of umpbtg •quipmtnt S3.0QO <br />* per iMsr foot costs rtprosont on bvorsoo o««r dw ItflgOi of tho protect sto