My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-2001 Council Packet
Orono
>
City Council
>
2001
>
11-13-2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:26:21 PM
Creation date
2/9/2023 3:23:29 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORDINANCK NO._____. SECOND SERIES <br />an ordinance amending the orono city code <br />TO ESTABLISH A STORM WATER DRAINAGE UTIUTY AND <br />USER CHARGFii FOR THE STORM WATER DRAINAGE imUTY <br />THE CITY OF ORONO. MINNESOTA DOES ORDAIN: <br />SECTION 1. 'Fhc following language is hereby added lo the Orono Cily Code as <br />Section 3.21- Rules and Regulations Relating lo Uie Storm Water and Drainage Utility. <br />Section 1. Storm Sewer System: Statutory Authority. Minnesota Statutes, section 444.075, authorizes cities lo <br />impose just and reasonable charges for the use and availability of storm sewer facilities ("charges"). By this <br />section, the city elects to exercise such authority. <br />Section 2. Findings and Determinations. In providing for such charges, the findings and determinations set out in <br />this subsection are made. <br />a. In the exercise of its governmental authority and in order to promote the public health, safety, <br />convenience and general welfare, the city has constructed, operated and maintained a storm sewer system <br />("the system") This section is adopted in the further e.xcrcisc of such authority and for the same purpose. <br />b. The system, as constructed, heretofore has been financed and paid for through the imposition of special <br />assessments and ad valorem Utxes. Such financing methods were appropriate lo the circumstances at llie <br />time they were used. It is now necessary and desirable lo provide an alternative method of recovering <br />some or all of the future costs of improving, maintaining and operating the system through the imposition of <br />charges as provided in this section. <br />c. In imposing charges, it is necessary to establish a methodology that undertakes to make them just and <br />equitable. Taking into account, the status of completion of the system, past methods of recovering system costs, <br />the topography of the cily and other relevant factors, it is determined that it would be just and equitable to a.ssign <br />responsibility for some or all of the future costs of operating, maintaining and improving the system on the basis <br />of the expected stoim water runoff from the various parcels of land w ithin the cily during a standard 5 -year <br />rainfall event. <br />d. Assigning costs and making charges based upon expected typical storm water runoff cannot be done with <br />mathematical precision but can only be accomplished within reasonable and practical limits. The provisions of <br />this section undertake lo establish a reasonable and practicable methodology for making such charges. <br />Page 1 o£ 4
The URL can be used to link to this page
Your browser does not support the video tag.