Laserfiche WebLink
ORDINANCK NO._____. SECOND SERIES <br />an ordinance amending the orono city code <br />TO ESTABLISH A STORM WATER DRAINAGE UTIUTY AND <br />USER CHARGFii FOR THE STORM WATER DRAINAGE imUTY <br />THE CITY OF ORONO. MINNESOTA DOES ORDAIN: <br />SECTION 1. 'Fhc following language is hereby added lo the Orono Cily Code as <br />Section 3.21- Rules and Regulations Relating lo Uie Storm Water and Drainage Utility. <br />Section 1. Storm Sewer System: Statutory Authority. Minnesota Statutes, section 444.075, authorizes cities lo <br />impose just and reasonable charges for the use and availability of storm sewer facilities ("charges"). By this <br />section, the city elects to exercise such authority. <br />Section 2. Findings and Determinations. In providing for such charges, the findings and determinations set out in <br />this subsection are made. <br />a. In the exercise of its governmental authority and in order to promote the public health, safety, <br />convenience and general welfare, the city has constructed, operated and maintained a storm sewer system <br />("the system") This section is adopted in the further e.xcrcisc of such authority and for the same purpose. <br />b. The system, as constructed, heretofore has been financed and paid for through the imposition of special <br />assessments and ad valorem Utxes. Such financing methods were appropriate lo the circumstances at llie <br />time they were used. It is now necessary and desirable lo provide an alternative method of recovering <br />some or all of the future costs of improving, maintaining and operating the system through the imposition of <br />charges as provided in this section. <br />c. In imposing charges, it is necessary to establish a methodology that undertakes to make them just and <br />equitable. Taking into account, the status of completion of the system, past methods of recovering system costs, <br />the topography of the cily and other relevant factors, it is determined that it would be just and equitable to a.ssign <br />responsibility for some or all of the future costs of operating, maintaining and improving the system on the basis <br />of the expected stoim water runoff from the various parcels of land w ithin the cily during a standard 5 -year <br />rainfall event. <br />d. Assigning costs and making charges based upon expected typical storm water runoff cannot be done with <br />mathematical precision but can only be accomplished within reasonable and practical limits. The provisions of <br />this section undertake lo establish a reasonable and practicable methodology for making such charges. <br />Page 1 o£ 4