My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-08-2001 Council Packet
Orono
>
City Council
>
2001
>
10-08-2001 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 3:23:01 PM
Creation date
2/9/2023 3:21:16 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11. <br />Niiiiiil li <br />12 and Brov^-n Road to allow for trafTic to safely access Highway 12. A righi-in <br />right-out intersection would allow direct access from the site to Highway 12. <br />Future connection to the west would potentially be to Brimhall with a lighted <br />intersection at existing Highway 12. This would reduce the amount of through <br />traffic on the residential property to the east. <br />Highw’ay 12 is scheduled to be relocated to the south. The existing 12 would <br />be reclassified and become a Hennepin County Road (Way^ta Boulevard). <br />Per Section 10.61, Subd. 10, required off-sucet parking is approved as follows; <br />No. of Parking Stalls: Required - 1 per 200 s.f. <br />Required " 1 per 200 s.f. of “net usable floor area for office use* <br />Total stalls required = 97 <br />Total stalls proposed = 97 <br />No. of Parking Stalls: <br />Required ■ 140 spaces <br />Total stalls proposed <br />Required 2 per dwelling unit (Section 10.61) <br />83 interior spaces .• . <br />SO e.xterior spaces <br />The standards for a building designed for senior housing use may not require the <br />same parking standards. The applicants have stated they do not feel all the <br />parking proposed on site will be necessary' for tiie use. <br />A 8’ wide regional trail is located along Brown Road. The plans have provided <br />pedestrian access to the trail via a path that would connect the main entrance to <br />the west. A 6’ sidewalk is located along the south property line. Connection to <br />the sidewalk has been provided to the main entrance. A path/trail will also be <br />provided to allow pedestrian access from the residential building to the office <br />use on the adjacent property. <br />The 62 unit building on the 4 acre site would provide 15.5 units'acre of senior <br />housing units at a variety of unit sizes and rental rates. The proposed RPUD <br />zoning district would be the appropriate zoning district to provide the units/acre <br />density requested. The RPUD district would allow the City of Orono to provide <br />Page 3 of 10
The URL can be used to link to this page
Your browser does not support the video tag.