Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Wednesday, February 19,2003 <br />6:30 o’clock p.m. <br />(^'03-2873 CITY OF ORONO, ConUoued) <br />Berg moved, Fritzler seconded, to recommend approval of the proposed MUSA <br />amendment for several properties on Old Long Lake. Ruann, and Wakefield Roads. <br />VOTE: Ayes 6, Nays 0. <br />(Recess svas taken from 9:00 - 9:05 P.M.) <br />(#6) #03-2869 DR. ROBERT GUMNIT, 1100 OLD CRYSTAL BAY ROAD, CUP <br />AND VARIANCE 9:05-10:04 P.M. <br />Dr. Gumnit, the Applicant, and his representative were present. <br />Chapul explained that the applicant was requesting five items in order to reconstruct a <br />1,440 s.f. (120 XI2 ) gravel driveway to access and use a 1.8 acre island on his property; <br />1. a variance for filling in 2,091 s.f. of a wetland, where no fill or hardcover is normally <br />permitted, <br />2. conditional use permits for movement of more than 500 cubic yards of fill and <br />mitigating wetland within shorcland overlay district; <br />3. a variance to allow an agricultural use (grazing of horses) within the 150’ of the <br />OHWL of French Lake <br />4. a variance to allow a 4’ fence to be located as close as 14’ from the OHWL of French <br />Lake where 150* is required; and <br />5. a variance for mitigating 4,234 s.f. of land within 75 ’ of the OHWL of French Lake <br />w here no grading or excavation is permitted. <br />Chaput pointed out that there is an existing trail accessing the island of land at this time, <br />however, over time, the trail has been worn down and the applicant wishes to improve it <br />for machinery to be able to drive on it. Construction of the driveway requires 2,091 s.f. of <br />wetland to be filled with approximately 132 cubic yards of material if rebuilt on the <br />existing drive. <br />With regard to other comments. Chaput stated that, after reviewing the application, the <br />City Engineer stated that a ivpical section of the proposed roadway should be included for <br />review and erosion control measures should be installed. The Minnehaha Creek <br />Watershed District (MCWD) stated that permits would be required, as well as, wetland <br />mitigation. Chaput indicated that the Department of Natural Resources (DNR) would also <br />require a pemiit, however, they will not renew the application until the snow clears and <br />they can perform their own independent survey. <br />Chap It stated that, if the Planning Commission feels that the applicant has shown undue <br />hardship and should be able to reconstruct a gravel driveway by filling in and mitigating <br />wetl.md to access the land, enclose the land with an electric fence to use it for pasturing <br />from time to time, then the variances and CUPs necessary should be approved including 5 <br />PAGE 17 of 26