Laserfiche WebLink
I . <br />Mk3.2«r o <br />Nv«ciib*r I7.200J <br />Pagt 1 «r3 <br />DMt ApflkaliMi Rtctivtd: •-lS-«3 <br />Dal* AppIkaMoa CoasMcrad as Coaipitic: S-S43 <br />M>Day lUskw Period Eipirts: 1(M^ encoded to <br />To: Chair Smith and Planning Commission Members <br />Ron Moorse, City Administrator <br />From: Janice Waataja, City PIanner|J\fJ <br />Date: November 13,2003 <br />Sabjcct: #03-2917, Winfield & Nancy Stephens. 350 Crestvieu Avenue <br />- Variances <br />- Public Hearing <br />Zoaiag District: LR - I A, One Family Lakeshore Residential District (2 acre min.) <br />Lot Area: .455 acres (19,817 s.f.) <br />Lot Width: 203 feet <br />ApiMcatioH Stmmary: Applicant requests the following variances to construct a new <br />residence on a lot subject to a 75* creek setback: <br />1. Lot area variance to allow a residence reconstruction on a .455 acre lot when 2 acres is <br />normally required. <br />2. Front yard setback variance to allow a front yard setback of 30* when 50’ is normally <br />required. <br />3. Side >’ard setback s'ariance to allow a side yard setback of 10' when 30’ is normally <br />required. <br />4. Rear yard setback variance to allow a rear yard setback of 30' when 50* is normally <br />required. <br />5. Hardcover variance to allow 45% hardco\er in the 75-250* zone when 25% is <br />normally allowed.______________________________________________________ <br />Su^HecomumtHdatUm: Staff recommendations: <br />1. Approval of the lot area variance to allow a rebuild of a .455 acre lot in a 2 acre <br />zoning district. <br />2. Approval of front, side and rear yard setback variances due to the .455 acre lot size <br />locat^ in a 2 acre zoning district. <br />3. Approval of the hardcover variance request to allow 45% hardco\er in the 75-250’ <br />zone due to the limited area in the zone._____________________ _________ <br />EihibiU <br />Exhibit A - Revised Site Plan Dated November 3.2003 <br />Exhibit B > Revised Hardcover Calculations <br />Exhibit C - Revised Floor Plans <br />E.xhibil D - Revised Elevations <br />Exhibit E - Revised Roof Lines <br />Exhibit F - Planning Report dated August 14,2003