My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-20-2003 Planning Packet
Orono
>
Planning Commission
>
2003
>
10-20-2003 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:40:54 PM
Creation date
2/9/2023 1:39:24 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday. September IS, 2003 <br />6:00 o'clock p.m. <br />((112 #03-2946 CLIFFORD L. OTTEN, CoattaMd) <br />Planned Unit Development No. I (PUD No. I) was approve in 1990 for Onen Brothers <br />Nursery and Landscaping for a commercial development at this site and the property was <br />subsequently so developed. In 1998 the City adopted Amendment No. 1 to PUD-1 to <br />allow a gre^ouse roof system to be constructed over a 19,000 s.f area Just east of the <br />main building. This construction left a 20* x 92* (1840 s.f) open corridor between the <br />greenhouse and the main building, which the applicant now w ishes to cover w ith <br />greenhouse roofing in a similar manner. <br />Building Oflicial Lyle Oman has noted that the existing greenhouse has a fire sprinkler <br />system w hich w ould be extended to iiKlude the new roof area. The additional greenhouse <br />roof w ill have no impact on tralfic circulation for the site. While the enclosure of the <br />current space w ith a greenhouse is not intended by the applicant to change the use of that <br />space, it is meant to provide it with climate control that allows its use to be extended in the <br />spring and fall. <br />Gaflron reported that staff recommends approval of an amendment to the PUD-1 <br />Agreement to allow construction of the greenhouse roof addition as proposed. <br />There were no public comments. <br />Hiwb moved. Mabusth secoaded. to rccommead Approval of AppUcalhw #2946. <br />Ofteo Brothers .Xurserv. 2350 West WavaaU Boulevard - Amend Coauncrcial Site <br />Plan (PUD-1) to allow construction of the greenhouse roof addition as proposed. <br />VOTE: Ayes 7. Nays 0. <br />(#13) #03-2948 WJ.M PROPERTIES. LLC. 2605 WEST WAYEATA BOULEVARD, <br />CONDITIONAL USE PER3UT EXTENSION. 9:30 - 9:40 P.M. <br />Peter Johnson. Applicant's representative, was present. <br />Gaffron reported that WJM Properties requests a 16-month extension of the approvals <br />granted in Resolution No. 484S. The applicant also requests that a S' fence no less than <br />SWi opaque, be substituted for the screening berm and plantings required at the north and <br />northeast end of the east parking lot. <br />To recap, Gaffron staled that, in August 2002 the City Council adopted Resolution No. <br />4845 granting Industrial Site Plan Approval and a CUP per Zoning Code Section 10.50 <br />Subd. 3(A) to permit use of the propeny for a w holesale distribution facility, repair, paru <br />warehouse, and fleet sales and leasing lot. Due to delays caused primarily by conditions <br />imposed by the Minnehaha Creek Watershed District related to weilaix) buffer and <br />easement requirements, WJ.M Properties has now applied for an extension of the approvals <br />granted in Resolution No. 4845 to December 31.2004, or an extension of 16 months. <br />PAGE 22 of 25 <br />II I iitUti
The URL can be used to link to this page
Your browser does not support the video tag.