My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-21-2003 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2003
>
04-21-2003 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:38:54 PM
Creation date
2/9/2023 1:36:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M3-2W2 OroBO Baiebill Atsoclatlon/Orono School Diitricl <br />1930 Old Coiul Bay Road North <br />Bate 3 of3 <br />Parking/Scating <br />The plans do not indicate the total seating capacity for the bleachers. Code would allow scaling up <br />to 288 based on the 48 spaces showTi for parking. The Code determines parking for athletic fields <br />as 1 parking space for each six scats of capacity. Each 22 inches of bleacher space devoted to seating <br />is counted as one scat when determining design capacity for the bleachers. Any bleacher space <br />devoted to aisle or any other purposed is not considered scat space. OBA has indicated the seating <br />capacity will be kept within the 288-seat limit. <br />Lighting <br />There are no lights proposed for the field. Any lighting used within concession stand areas shall be <br />installed and shielded to not expose the light source, per code •■cquiremcnls. <br />Trail Connection <br />The fiiturc trail along C.R. 6 would provide a needed link to the cast. A trail is located cast of the <br />properly to Willow Drive and continues south to the southern end of the Willow View Development. <br />Final trail construction design and engineering would be completed at some point in the future. A <br />condition of the approval is that the School District grant an casement for the trail connection. <br />V. Stormwater Management <br />OBA’s Minnehaha Creek Watershed District permit is complete pending School District execution <br />of a Declaration and Agreement regarding wetland buffers, street sweeping, stormwater facility <br />maintenance and use of non-phosphorus fertilizer. Drafts of those documents arc attached. <br />Issues for Consideration <br />Staff believes all issues were resolved with the original approval. Planning Commission should <br />address any issues of which staff is unaware or which may result from public comment. <br />Staff Recommendation <br />Applicants are requesting renewal of their previous approval with no changes. Staff recommends <br />approval per the findings and conditions of Resolution No. 4689.
The URL can be used to link to this page
Your browser does not support the video tag.