My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-21-2003 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2003
>
04-21-2003 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:38:54 PM
Creation date
2/9/2023 1:36:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iO}-2n2 Oreoo Bateball AsMciatfon/Oroao School District <br />1030 Old Crystal Bay Road North <br />Pafc2of3 <br />HackgroBBd • Lee Cartfoa Fields aad School Property <br />In 1994 Ihc Orono Baseball Association (OBA) constructed the two existing baseball Helds on the <br />property. No Conditional Use Permit was required for the west */i of the property. The City of <br />Orono leased the west '/i of the property from the Orono School District, and then leased the property <br />to OBA. It was the opinion of the City Anomey that as long as the City w as leasing the property <br />from the School for a period greater than ten y-cars that the baseball fields would be considered a <br />permitted City park use. T^c lease between the School District and City of Orono was entered into <br />on April 15,1994 for a period of 1 9 years and 11 months, terminating on March 1 5,20 1 4. The Code <br />permits any municipal use in the zoning district. <br />The east '/i of the property is the proposed location of the new bascbalL'socccr field. Since the City <br />does not have a lease for this portion of Ihc property and it is owned entirely by the School District <br />a Conditional Use Permit is required for the construction. Schools and their associated facilities <br />require a CUP or CUP Amendment when such facilities arc proposed. OBA is in the process of <br />amending their ground lease directly with the school district for this half of the site. <br />As a condition of approval of the new Orono Middle School all the properties located cast of Old <br />Ci^tal Bay Road have been combined into one parcel. The parcel includes the baseball fields and <br />Middle School. In 1999 the CUP for Middle School construction was approved and the school <br />opened in the fall of2000. <br />SJlrFlan Review <br />I. Site Layout <br />The access road will be an extension of the existing access from Old Crystal Bay Road The road <br />will lead to a 48 stall parking aica west of the ball field. In addition, the parking area will include <br />a turnaround with a 65 radius. The 65* radius is 15 ’ narrower than a t\pical cul-de-sac width, but has <br />been approved by the City Engineer and Fire Marshal. The tumaroGnd area is necessary for IrafTic <br />flow, safety and to provide a suitable drop offsite for the fields. <br />Pedntrian access will include a sidewalk that w ould be located adjacent to the new parking area and <br />provide acc^ to a future trail extension along County Road 6. OBA has committed to working <br />jointly on this trail connection with the City. Orono Schools and Hennepin County. <br />shown on the plans are baiting cages, a 24* X 36* storage building, play lot and announeer ’s <br />booth. \N cst of the existing fields the OBA will replace an exisung storage shed with a larger shed <br />and expand the parking area along the entrance drive.
The URL can be used to link to this page
Your browser does not support the video tag.