My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-17-2003 Planning Packet
Orono
>
Planning Commission
>
2003
>
03-17-2003 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 1:37:33 PM
Creation date
2/9/2023 1:36:26 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Application Received; 2/18/03 <br />Application Complete: 2/20/03 <br />60 Day Deadline: 4/21/03 <br />TO:Choir Smith and Orono Planning Commission Members <br />Ron Moorsc, City Administrator <br />FROM: Jennifer Chaput. City Planner <br />DATE: February 25.2003 <br />SUBJECT: #03-2875 Sandra Ann Benson <br />1376 Baldur Park Road <br />Variances - Public Hearing <br />Zoning DisIricI: LR-IC One Family I okeshore Residential District (0.5 acres) <br />Lot Area: 0.27 acres (11,992 s.l.> <br />Application Summary: <br />The applicant requests the folloNsing variances to reconstruct and expand the roof of an existing <br />principal structure and replace windows and doors on the second story: <br />1. E.\pand portion of principal stmeture located 25.1’ the OllWl. of lake Minnetonka <br />where 75’ is requin»l; <br />2. A side yard set^k of 5.6' where 10 ’ is required; and <br />3. A 48.7’ encroachment into the average lakeshore setback. <br />Neither the footprint of the structure nor hardcover is proposed to change with the roof <br />expansion. The applicant proposes to remove a portion of the existing roof of the original <br />structure and replace it with one continuous ridge, approximately 14” higher than the existing <br />roof structure (or 1 ’-10" below the roollinc attached to the west). The exact height may vary a <br />few inches from what is proposed once the structure is worked out. ______________ <br />Exhibits: <br />A Anal>'sis Worksheet <br />Application <br />Survey <br />Hardcover Calculations <br />Structural Engineer’s Letter <br />Existing Elevation <br />Proposed Elevations. Floor Plan, Ceiling Plan. Roof Plan and Section <br />Resolution # 2483 (Zoning File #1280) <br />Plat Map <br />Topography Map <br />Property Owner's List <br />Permit Record <br />Photos of Property <br />C <br />D <br />E <br />F <br />G <br />H <br />1 <br />J <br />K <br />L <br />M <br />Sandra Ann Benson <br />I'IS 200i <br />Page I qf 5
The URL can be used to link to this page
Your browser does not support the video tag.