Laserfiche WebLink
L <br />MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Wcdaciday, JM«ary 22,2003 <br />6:30o*clockp.B. <br />ROLL <br />The Commission mci on the above mentioned date with the following members present; Chair Sandra <br />Smidt. Commissioners David Rahn. J. Mark Fritzler. Liz Hawn. Jeanne Mabusth, Stephanie Zugschwert, <br />and Julc Hannaford. Representing staff were Planning Director Mike Gaffron and City Planners Wendy <br />BoCtenberg and Jennifer Chaput, and Recorder Kristi Anderson. <br />Cofiunissionen* Janice Berg and Cynthia Bremer; and Council Representative Mayor Peterson were <br />absent <br />Chair Smith called the meeting to order at 6:34 P.M. <br />CONSENT AGENDA <br />(«l) M2>2tS5 KEVIN GARNETT, 450 ORONO ORCHARD ROAD. RENEWAL <br />CUP/VARIANCE <br />Hawn Moved, Malwslh accooded, to rccoMBcad approval of Applicalion M02-2855 Kevta Garnett <br />450 Orono Orchard Road, rcocwlng a variance and coadittonal nsc permit to permit constmetloa <br />of n new **gncsl honac** on the property, sobject to the property ow ner flUng a restrkth e covenant <br />In the chala of tMe of the property that wonid Ihnll nse of the goest honae to ocenpaato of the <br />priacipal atroctnre and their non-paying, gnests or domestic employees, and that the gnest home <br />conM not be nsed for a home occapatlon. VOTE: Ayes 7. Nays 0. <br />(«2) «02.2aS0 JOHN AND PATRICIA WALKER. 1318 SPRITE PLACE. VARIANCE <br />Hawn moved. Mabnsth seconded, to recommend approval of Application 802-2850 John and <br />Patricia Walker, approving a rear yard setback and hardcover variances in 75-250* setback zone to <br />construct a deck on the rear of the residence located at 1318 Spmee Place. VOTE: Ayes 7, Nays 0. <br />OLD BUSINESS <br />(#3) 002-2854 KEVIN .^LANXEY 1973 EAGERNESS POINT ROAD, CUPA'ARIANCE 6:40 - 7:18 <br />P.M. <br />Kevin Manley, the Applicant, and Eduardo Suarez of Gustafson Design. Inc. were present. <br />Gaffron explained that on December 9, 2002. the City Council reviewed the application including the <br />vanous unresolved issues aside from the retaining wall request and provided direction, much of which <br />will be addressed at the February Planning Meeting. <br />At this time. Gaflhm reviewed the three proposed boulder wall landscaping plan options for the <br />Commission. He explained that each of the options incorporates a stairway sy-stem to provide continued <br />access to the lake, and a 'Tirst flush” drainage system behind the top of the boulder wall to allow retention <br />and natural filtration. <br />PAGE I of 29