My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-1978 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1970-1979
>
1978
>
09-11-1978 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 12:50:44 PM
Creation date
2/9/2023 12:49:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If <br />Mrs. Roy Hollander <br />255 Sixth Avenue North <br />Subdivision <br />Page 2 <br /># ‘ <br />PIANNING COMMISSION MEETING - JULY 24, 1978 (CONT.) <br />Itie current proposal is to do the division in two phases: <br />Phase I: The west parcel to be divided into eight lots <br />plus a remaining outlet. <br />Phase II:The east parcel plus the Phase I outlet to be <br />divided Into the remaining seven lots to complete <br />the total division as presented in this sketch <br />plan. <br />Discussion included desire for private road of 50 ft. ROW width, <br />no direct lot access to County Road 6, a temporary cul de sac, <br />and an easement to the City for the continuation of the proposed <br />road through the east (Phase II) parcel. Mrs.Hollander proposed <br />that the existing rental house be eventually included on her lot <br />as a guest house. <br />MEMO UPDATE - AUGUST 23, 1978 <br />As of today all materials have been received for preliminary plat <br />review. Comments have been requested from the City engineer, the <br />on-site Inspector, Hennepin County Dept, of Transportation and the <br />Hennepin Soil and Water Conservation District. A public Information <br />meeting has been scheduled for September 11, 1978. <br />PIANNING COMMISSION MEETING - AUGUST 28, 1978 <br />Work Session - Mrs. Hollander present. She is proposing to do the <br />final plat in two phases. She expects to develop it with a private <br />road and a temporary cul-de-sac. Planning Commission noted that they <br />would require platting the road as an out lot through the entire plat <br />at the first stage. Other staff review is pending.
The URL can be used to link to this page
Your browser does not support the video tag.