My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-11-1978 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1970-1979
>
1978
>
09-11-1978 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 12:50:44 PM
Creation date
2/9/2023 12:49:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />DATE: <br />FROM: <br />SUBJECT: <br />File <br />September 5, 1978 <br />Michael P. Gaffron, Septic System Inspector <br />Septic System Soil Test5.ng <br />Hollander Subdivision (#412) <br />On Thursday, August 31, 1978, I met with Jim Anderson of the <br />Hennepin Soil and Water Conservation District to review the soils <br />report for the Hollander Subdivision. We made additional soil <br />borings on a number of lots and generally our observations were <br />consistent with the data presented, except in two cases. <br />*• <br />Lots approved for standard systems: Block 1, Lots 2, 3, and <br />4; Block 2, Lots 2, 3, and 4. A3' vertical separation from <br />the watertable must be adhered to, requiring trenches which <br />are more shallow than normal for certain of these lots. <br />Lot 1, Block 2 will require a mound system as per proposal. <br />Our boring on the proposed septic system site for Lot 1, Block 1 <br />indicated a seasonal water table at 1' to 2' deep. A mound system <br />will be necessary for the proposed site rather than the standard <br />system proposed.
The URL can be used to link to this page
Your browser does not support the video tag.