Laserfiche WebLink
Tom Leach - 2535 Shadywood <br />Subdivision and Conditional Use Permit for Duplex <br />Page 3 <br />4t^. A Ait ' <br />2) <br />3) <br />Access easement be provided for residential lot 3} and <br />Drainage and utility easements be provided as approved »>y City <br />Engineer (15* along south boundary line); and <br />Wetlands and flowage easement over area designated as wetlands <br />(description and agreement to be approved by City Engineer and <br />City Attorney), <br />\ <br />Connission also recomnended refusing offer to donate lot 3 to the City <br />and approve conditional use permit to construct duplex on lot 3 su Ject <br />to structure meeting all setback requirements. <br />In conjunction with the approval of the conditional use permit, the <br />Comnission added the condition of a park dedication fee for the residential <br />lot as a condition of approval of the preliminary plat ($2,000 park ^ <br />dedication fee - $1,000 per dwelling unit). <br />STAFF - January 18, 1978 <br />Don Murphy of Hennepin County Public Works, called me. He Informed me <br />that Dr, Leach had met and convinced him that a connon access located <br />at the coinnon lot lines of lots 1 and 2 might be objectionable because <br />of the steep slope at this location. Mr. Murphy a Iso informed me that <br />the County would recommend a 26' road easement rather than the 24 ease-cne uounty wouxu ,.cv,wu«uw« » -- - - - - - - - - -^ -i ^ o <br />ment as indicated on the plan. He also suggested that access to lot Z <br />at the time of development should be located at the south boundary <br />of lot 2 to reduce traffic congestion. A report with these recomnendatlons <br />will be coming shortly. <br />CITY COUNCIL - January 23, 1978 <br />Reviewed proposals and approved preliminary plat according to <br />Planning Commission reconmendations. Will require standard title opinlw <br />review and conservation easement over wetlands. Council also concept^lly <br />approved conditional use permit for duplex pending final plat approval. <br />MEMO UPDATE - AUGUST 23, 1978 <br />All requirements of preliminary plat approval have been completed. <br />The proposal Included consideration of a duplex unit on Lot 3. <br />Because final planning has not been completed for the duplex, final <br />approval of the conditional use permit will have to be delayed. The <br />park fee has been paid on the basis of future duplex approval. <br />The plat Includes a 30 ft. driveway and utility easement over Lot 1 to <br />serve Lot 3 and a 30 ft. utility easement along the entire southeast <br />side for future Installation of storm sewer. <br />I reconmcnd approval of the final plat according to the attached resolution <br />and deferral of action on the conditional use permit pending receipt of <br />a n,oi!q>lete site plan.