My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-14-1978 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1970-1979
>
1978
>
08-14-1978 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 12:49:38 PM
Creation date
2/9/2023 12:49:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Karl Gardner Stjbdivision <br />2885 Sixth Avenue North <br />Soil Testing for On-Site Sewage System <br />Page 2 <br />#356 •: » <br />ADG 8, 1978 - STAFF NOTE (from Mike Gaffron) <br />Additional soil test data forj <br />Lot 1, Block 2: <br />Percolation rates averaging 17 minutes per inch and water <br />table at a depth of 6.5 feet indicate that a standard system would <br />be allowed for the alternate drainfleld. <br />Lot 2, Block 2: <br />Percolation rates averaging 22.5 minutes per Inch and yater <br />tables ranging In the area of 2.5 to 5.5 feet Indicate that shallow <br />trenchel « mSund aystem for the primary drainfleld and a mound aystem <br />for the alternate drainfleld would be required. <br />L
The URL can be used to link to this page
Your browser does not support the video tag.