My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-13-1978 Planning Packet
Orono
>
Planning Commission
>
1978
>
03-13-1978 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 12:44:03 PM
Creation date
2/9/2023 12:42:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pi‘]5lic Works Phone 935-338t 320 Washington Av. South. Hopkins. Minnesota 55343 <br />A <br />T-IT » <br />J <br />HGNNePIN COUNTY <br />December 8, 1977 <br />Mr. Henry F. Muhich <br />Zoning Administrator <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, Minnesota <br />Dear Mr. Muhich: <br />55323 <br />ojmmii n ■I! . <br />i I <br />'J <br />« At <br />\ <br />/ • • • #RE: Proposed Plat - "The Farm at Long Lake" <br />CSAH 6 - South side at Dakota Avenue <br />Section 26, Township 118, Range 23 <br />Hennepin County Plat No. 600 <br />Review and Recommendations <br />Thank you for submitting this plat for our review. We reviewed the proposed <br />plat and have the following comments: <br />1. Reserve, for road purposes, an easement 10 feet wide, south of and <br />adjacent to the south right of way line of CSAH 6. <br />2. The proposed new access road from the plat to CSAH 6 Is acceptable. <br />However, the access must not be located more than 35 feet west of <br />the inplace field entrance. <br />3. The developer must apply for and obtain an approved entrance permit <br />before beginning access construction. Entrance permit forms are <br />available from our Traffic Division. <br />4. All lots must have access to the proposed city street. Individual <br />direct access to CSAH 6 will not be permitted. <br />5. All other construction within county right of way must receive <br />County Engineer approval prior to beginning construction. This <br />includes, but is not limited to, drainage revisions, utility <br />construction, trail development, and landscaping. <br />6. All areas within county right of way that are disturbed during <br />construction must be restored by the developer. <br />Please direct your response or questions on the above comments to Douglas <br />Mattson at this office. <br />^incerely, . <br />^ 0. M. Wold, P.E. <br />Chief - Planning & Prograiming Division <br />cc: Tim Adams, Developer <br />JMW:DBM:rm <br />Minorities. Women and Other Protected Classes ate Encouraged to apply <br />tor Emplorrnent at H&nnepm County
The URL can be used to link to this page
Your browser does not support the video tag.