My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-27-1978 Planning Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
1970-1979
>
1978
>
03-27-1978 Planning Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 12:31:42 PM
Creation date
2/9/2023 12:31:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
# <br />minutes of a planning commission meeting held march 27, 1978 - PAGE 5 <br />Motion - Ayes (A); Nays (0). The motion passed. <br />o <br />o <br />xhe Zoning Administrator explained that this <br />request is to construct a bridge over the wetlands. <br />He stated the City has received some new plans <br />'^ith the dimensions noted. <br />Betty Buesgens was present. She explained she <br />has no access the lake without going over <br />the wetlands. <br />• <br />Commissioner Hassel asked if there was a con <br />servation easement over this area now. The <br />Zoning Administrator replied yes and that a <br />variance would have to be granted on this also. <br />Chairperson McDonald questioned if riparian <br />rights might be involved. <br />Ms. Buesgens stated the property has 160 ft. <br />of shoreline, adding that all she wants is to <br />have access to the lake. <br />The Zoning Administrator comnented this is a <br />great improvement to the first plan which had <br />been submitted. <br />The Planning Commission reviewed the revised <br />plans showing the location of the bridge and <br />dimensions noted. <br />Ms. Buesgens stated there would be a 6 ft. wide <br />bridge and the pilings would only be up to the <br />edge of the wetlands area with no center pole. <br />She stated she will be doing no filling of the <br />wetlands and that she will stay within any <br />restrictions requested by the Commission. She <br />added that in talking with her contractor, the <br />work can be done without disturbing the wetlands. <br />There being no further discussion. Commissioner <br />Hassel moved. Commissioner Frahm seconded, a <br />motion to recommend approval of the request by <br />Betty Buesgens for construction of a bridge <br />over the wetlands at 3067 Farview, with the <br />following conditions: <br />The 6 ft. wide bridge be constructed with <br />the pilings only along the sides of the <br />wetlands; and <br />There be no filling or dredging within <br />the wetlands area. <br />JAMES LAWRENCE <br />TANGLEWOOD <br />#323 <br />(con't) <br />BETTY BUESGENS <br />3067 FARVIEW LANE <br />WETLANDS VARIANCE <br />#359 <br />Motion - Ayes (4); Nays (0). The motion passed.
The URL can be used to link to this page
Your browser does not support the video tag.