Laserfiche WebLink
pcT CITY OF ORONO, MINNESOTA <br />MINUTES OF A PLANNING COMMISSION MEETING HELD FEBRUARY 6, 1978 <br />The Orono Planning Commission met on the above <br />date with the following members present: Com­ <br />missioners Wilson, Hurr, Hammerel, Frahm, Hannah <br />and Chairwoman McDonald, Commissioner Hassel <br />attended, but left prior to roll call due to <br />illness. Also present was Zoning Administrator <br />Hank Muhich, <br />ATTENDANCE-7:30 P.M. <br />M.' <br />1 <br />Chairwoman McDonald announced this was the time <br />and place for a Public Hearing on the petition of <br />Paul Raster for preliminary approval of a sub­ <br />division at 2600 Casco Point Road. The Zoning <br />Administrator presented the Notice of Public <br />Hearing and the Affidavit of Publication. <br />PUBLIC HEARING-7:30 P.M <br />fAUL .\A3TER <br />2600 CASCO POINT ROAD <br />SUBDIVISION (PRELIM.) <br />#346 I <br />He explained that this property is east of Casco <br />Point Road with approximately 150 ft. on the <br />lake and only one lakeshore lot with riparian <br />rights. There is only a very small wetlands area <br />across Lots 8 and 9. There is adequate area for <br />each lot for the setbacks. He also stated the <br />City Engineer had been out to view the property <br />and had several suggestions. He read the letter <br />from Jim Olson dated February 2, 1978 which included <br />the following suggestions: <br />2. <br />Q5 <br />1. The driven centerline of Casco Point Road <br />crosses the westerly parcel and a specific <br />roadway easement should be shown. <br />Because of very severe grades a driveway <br />construction plan should be submitted for the <br />lot adjacent to the lake along with the <br />description of the driveway easement across <br />the westerly parcel. <br />3. Additional sewer and water service lines <br />will have to be installed as a result of the <br />lot split. Hov;ever, depending on the elevation <br />of the sanitary sewer in Casco Point Road, <br />it may not be possible to extend a gravity <br />sewer service line to the lakeshore lot. <br />Because of a small amount of run-off which will <br />drain across these two lots, a drainage ease­ <br />ment will be required and a culvert may be <br />required if there is any fill for either the <br />sewer or the driveway along the north line of <br />the westerly parcel. <br />An erosion control plan will be required because <br />of the very steep slopes of the lots. <br />4. <br />The Zoning Administrator explained these items <br />would have to be resolved before this request <br />goes to the Council. <br />t1 <br />m <br />m <br />i <br />X <br />i •• <br />9I