My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-2002 Council Packet
Orono
>
City Council
>
2002
>
12-09-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2025 12:35:47 PM
Creation date
2/9/2023 9:56:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • • <br />altemative for riprap to prevent shoreline erosion. Both the east and west <br />shores will be accessible to the public and represents a visible opportunity <br />for public education. <br />Estimated Costs <br />The LCMR funding paid for the acquisKion of the private marina property that will <br />become a public water access. The City of Minnetonka funding is estimated at <br />$1 million. The Minnesota Department of Natural Resources funding is estimated <br />to be $800,000 for the public water access and shore fishing areas. The cost to <br />Hennepin County to upgrade Highway 101 (which would include standard <br />shoreline treatments) is unknown. The costs to each funding partner for staff <br />time, expenses and design costs are also unknown. <br />For the purposes of this Minor Plan Amendment, only the estimated costs for <br />Minnehaha Creek Watershed District to participate in the project is of interest. A <br />conceptual level estimate for Minnehaha Creek Watershed District participation <br />in the project follows: <br />Estimated MCWD Costs <br />J^hase.l t Oray's Bay.Publlc Access and Launch <br />Proiect Element Tvoe of Cost Estimate <br />Planning Staff <br />Consultants <br />$ 15,000 <br />$ 5,000 <br />Technical Review Consultants $ 3,000 <br />Design $ 0 <br />Construction Cost Participation S 200.000 <br />Phase 1 <br />Annual O&M Staff <br />Cost Participation <br />$ 500 <br />S 1.000 <br />Annual <br />Total <br />$ 223,0 <br />$ 1,800 <br />(Note: The City of Minnetonka estimates total costs for design and construction <br />at $1,570,000) <br />C:\My DocumMSW/ICWOOrt^ B«y Bio\ptan»wnilnMntdoo <br />7
The URL can be used to link to this page
Your browser does not support the video tag.