My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-2002 Council Packet
Orono
>
City Council
>
2002
>
12-09-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2025 12:35:47 PM
Creation date
2/9/2023 9:56:06 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Credits for Trunk Water and Storm Drainage Facilities <br />Constructed by Developer <br />Developer ’s Calculations <br />There are construction costs that will be incurred as part of the StoneBay project that <br />have area wide benefit. These include the construction of a regional storm water pond," <br />trunk storm sewer lines that serve adjacent properties and ovcrsi^ing of watermain. The <br />following is an estimate of the costs associated with each. It is the developer's opinion <br />that these costs should be reimbursed by the City’s Tivnk Funds or that t*- e costs should <br />be deducted from the trunk assessments and connection fee; paid by developer. <br />L Unit Unit Cost 1 Quantum'1 Amount | <br />VII. Trunk Watermain Costs <br />12" versus 8" DIP L.F.(5.00)2,020.00 (10,100.00) <br />12 ” versus 8" Valves#Each (400.00)2.00 (800.00) <br />Fittings LBS (1.50)800.00 (1,200.00) <br />Connect to existing (reconfigure)L.S.(3,000.00)1.00 (3.000.00) <br />ISubtotal (15,100.00)1 <br />IX, Regional Pond & Outlet Pipe Costs -• <br />•—V <br />Excavation CY.S8.00 10,000 $83,000 <br />Seeding Acre SI,000.00 1.5 $1,500 <br />Outlet control structure L.S S2.500 00 2 $5,000 <br />15 “ RCP LF.S28.00 45 $1,260 <br />Jack/Bore 18 “ RCP \v/36 “ casing pipe L.F.S220.00 120 $26,400 <br />18 “ Apron Each $750 00 1 $750 <br />Rip Rap C Y.$75.00 30 $2,250 .* <br />Isubtotal $117,160 1 <br />X. Storm Sewer Co'.ts to Serve Property to West <br />30" RCP L.F.$50.00 560 $28,000 <br />Storm Manhole Each $4,000.00 1 $i.poo <br />30 ” Apron Each $1,250.00 1 *51,250 <br />K^p Rap C.Y.$75.00 30 ...$2;250 <br />Sublotiil !^,soo i <br />X’ <br />XI. Storm Sewer - LaternI Benefit From Pipe Installed to Ser>'e Property to West C,'* ' . ^ <br />18 “ versus 30 “ RCP L.F.$31.00 460 $14,260 <br />48“ \s. 60 “ Storm Manhole Each $2,000.00 1 $2,000 <br />18 vs 30 “ Apron Each $750.00 1 j $750 - <br />Rip Rap C.Y.$75.00 10 $750 <br />I Subtotal $17,760 1 <br />-riy' <br />Trunk Storm S*w«r Cost of Stetion .\l - X <br />TotftI Trunk Drain.igc Cost • Ats'jmed R«imbursemci.'t by CItv <br />SI 7.740 <br />SI34.900 ^
The URL can be used to link to this page
Your browser does not support the video tag.