My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-25-2002 Council Packet
Orono
>
City Council
>
2002
>
11-25-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:19:30 AM
Creation date
2/9/2023 9:51:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
net ------ <br />/ \ <br />V j <br />II <br />( <br />t <br />( <br />S. TtalDc: Ourturninf movement template indicaies a WB*SO track (Qrpicalinovinf van) will not pass ihrouihihe <br />round^ouL It appean the street would need to be widened Iqr 4^ftet to allow the WB-50 tuning movement The <br />roundabout should be redesigned to accommodate a WB-50 track. Another possible solution short of widening the <br />roadw^r would be to install tunnountable curb along the inside radius of the roundabout with a4-foot wide concrete <br />sidewalKDehind the curb. The tear dres of the WB'SO track would ride on the sidewalk and the turning movements <br />could be accommodated without disturbing any landscapiag. This latest version of the plans has added another <br />access onto Keli^ Parkway near the west end of the project We would strongly discourage the <br />and would encourage a redesign of West Circie/West Lane that provided two accesses onto Kelley Parkway rather <br />than the three shown. The West Lane access onto Kelley Parkway should be consiracted 28-feet wide foce-to-face. <br />ۥ Site Grading: The overall site plan should include an earthworks summary to quantify the proposed cut and fill. <br />Retaining walls over 4-feet in height require a separate engineered design suboilttaL <br />7. nnandal Guarantee: When final plans have been conqileted we will prepare an estimate of the total cost for the <br />site improvements to determine the amount of the financial guarantee required. <br />8. General: Ail utihfy and street construction shall be in accordance with City engineering standards. Future half size <br />plan tubmittab should be scaleable. <br />Please contact me at (6S1) 604-4863 if you have any questions regarding this matter. <br />Yours very truly. <br />BONE^OO. ^OSEI^, ANDERUK & ASSOCIATES. INC <br />Tom Kellogg <br />Cc: Greg Oappa, City of Orono
The URL can be used to link to this page
Your browser does not support the video tag.