My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-25-2002 Council Packet
Orono
>
City Council
>
2002
>
11-25-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:19:30 AM
Creation date
2/9/2023 9:51:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J/ J Bonestroo <br />gjg Rosene <br />V ■ Anderlik & <br />Associates <br />Engineers & Architects <br />October 1,2002 <br />Mr. Mike Gaffron <br />Planning Director <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay. MN5S323 <br />■encfcroo. ffofcr>€. A««dtrfik snd Aiio<l«tct, Inc. Ii »n AfrifftiEiivc ActloiVfquEt OpA^fwnfty <br />tmpleycr and Employ** Own*tf I <br />Principalt: Ono a ■on*ttroo. P.C. • Mjrvin L Sorvofa. PJ. • Glonn * Cook. PE. • tS ^ I <br />Robert a SciHjnIcm. P.E. • Jtrry A. Bourdon, PJ. <br />Senior Conttiltantf: Robert W. Roser>*. PE. • Joicph C Andertik. PX • Ricttjrd f. Ibrrter PX • <br />Susan U Eberiin. CPA. ^ <br />Aisoclat* Principals: Howard A. Sanford. PX • Keitn A. Cordon. PE. • Robert R. Preffert*. PE. • <br />Richard W. Poster. PX • David O. Loskota. PX • Robert C Rustek. A.1A. • Mark A. Hanson, pj, • <br />Michael T. Rautmann. PX • Sed ILPiefd. PX • Kenneth P. Andersoa PX • Mark R. Roifi. PX • <br />David A Ron*stroo. M^A • Sidney P. Winamson. PE. LI • Agnes M. Rirsg. M BA • ARan Rkk SctvnidL PX <br />Offices: St Paul. St Cloud. Rochester and UOlimar. MM • MRwaukee. WI <br />U^bslte: wwwbonestroo.com <br />• / <br />Re: Stonebay PUD Master Plan, Phase I <br />File No. 1 39-02 000 <br />Plat No. 02-2789 <br />Dear Mike: <br />We have reviewed the PUD master plan for the proposed Stonebay development The site is located in the northwest <br />quadrant of the intersection of Willow Drive and TH 12. The proposal provides for a mix of residential housing and <br />future commercial development. We have the following comments in regards to engineering matters. <br />1. Sanitary Sewer: The City should review MnDOT plans and schedules for utility improvements as pan their T.H. <br />12 improvement project As noted in our previous review comments the sanitary sewer between T.H. 12 and the <br />railroad tracks will need to be upgraded to serve the ultimate developntent of the Stonebay site. The plans should <br />identify Ijow sanitary service will be provided to Outlot A. The sanitary sewer manhole details should be revised to <br />include an Infi-Shield exterior sealing system or approved equal. <br />2. Water Main: Hydrants should be installed at all high points in the system. Stainless steel bolts shall be used on all <br />hydrants. All water main bolts shall be stainless steel or Cor-Blue t-bolts with protected caps. All water main <br />ir.iUllation sh.'ill be in accordance with City standards. <br />3. Storm Sewer: This latest plan set does not show relocating the downstream pipe from the ponding area north of <br />T.H. 12. We recommend the pond outlet pipe be relocated westerly to align with the existing notth/south ditch along <br />the west side of the golf dome. As noted in our previous letter, the golf dome experiences parking lot and building <br />flooding during heavy rain events. The realignment of the pond discharge will eliminate two bends in tlie ditch and <br />divert storm water away from the golf dome parking lot A minimum of 2-feet of freeboard should be provided <br />between a!i basement elevations and pond high water levels. Grading plans should include 100-year high water <br />elevations and rroposci; emergency overOow elevations and locations for all wetlands and ponding areas. A <br />drainage a.*ca nap. stor a sewer and ponding calculations should be submined for our review. Erosion control plan <br />comments will follow under separate cover. The wetland delineation report should be submitted for review. Final <br />plans should be submitted to the Minnehaha Creek Watershed District ^!C WD) for their review and approval. <br />4. Streels/Trails: We recommend a minimum radius of SOO-feet for all horizontal curves on Kelley Parkway to <br />provide an added measure of safety and improve sight distance. Plans should include vertical curve information. <br />The riglii-of-way width shown along the e.astcrly SOO-feet of Kelley Parkway is inadequate for the proposed street <br />design. The right of way w idth should be increased to provide a minimum of 15-feet behind the back of curb. A <br />center northbound left turn lane and southbound right turn lane should be constructed on Willow Drive as port of this <br />project The trail shown along Willow Drive north of Kelley Parkway should be realigned to intersect with Kelley <br />Parkway at the intersection with Willow Drive. The plans show a trail and sidewalk adjacent to each other along the <br />south side of Kelley Parkway north of the pond. It is unclear why a trail and sidewalk are necessary. The trail along <br />, Willow Drive south of Kelley Parkway should be consuuctcd to T.H. 1 2 as part of this project The design guideline <br />for Kelley Parkway on Sheet C2.2 shows a 5-foot sidewalk directly behind the curb. The City should review and <br />ectmment whether this is adequate for snow storage. The same design guideline show3 a 5 -foot “trair on the other <br />side of the street all "trails” should be const. u>‘ied to a minimum width of 8-feet A geotechnical report R-value <br />recommendation and pavement design should be pnwided for review. <br />2335 West Highway 36 • St. Paul, MN 55113 ■ 651*636-4600 ■ Fax: 651-636*1311
The URL can be used to link to this page
Your browser does not support the video tag.