Laserfiche WebLink
r . <br />! <br />aty ofOrono <br />Mr. Gregory Gappa <br />Page 2 September 27,2002 <br />30-50> BUILDING FRONT 8i CO URTYARD aRCLg <br /># Grade for proper contours and correct drainage <br /># Install A" topsoil <br /># Sod complete <br />Labor & Material: $1,355.< <br />^ Transplant (1) targe Linden tree <br /># Remove from Site (1) damaged Unden tree <br />^ Plant (1) 3* caliper Cockspur Hawthorn tree <br />350.00 <br />• • <br />NoOiarge <br />550.00 <br />^ Edge and install wood mulch around (5) trees (on site)475.00 <br />^ Steel edging, landscape rock and film 546.00 <br /># (3) Andorra Junipers <br />TOTAL COSTS: $9,396.1 <br />This proposal reflects workmanship performed at a high standard with quality <br />materials. This proposal also reflects complete site clean up. <br />Sincerely, <br />George Norling, Presiddit