My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2002 Council Packet
Orono
>
City Council
>
2002
>
10-14-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:18:24 AM
Creation date
2/9/2023 9:50:00 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NORLING'S <br />Lake Minnetonka Landscapes, Inc. <br />4113 Sun««t Prlv*. Sprint P«rk, MN S53S4 <br />(932)4n'02S5 te(932)4714311 <br />QtyofOrono <br />P. 0.60x66 <br />Oystal Bay, MN 55323 <br />September 27,2002 <br />ATTN: Mr. Gregory (Sappa, Director of Public Services <br />RE: Landscaping/Drainage/Waterproofing (refer to schematic/rough sketch) <br />Location: Qty Hall Building <br />Dear Mr. Gappa: <br />Based on site measurements, inspection and as per our conversation, we propose to <br />furnish and install the following: <br />30-50^ of BUILDING FR <br />^ Design & Schematic On>Site Sketch No Charge <br />^ Asphalt and 6 mil poly seal foundation <br /># Exchange excavated materials for compactable soils <br />(excavation and compactable materials supplied by Orono) <br /># Compact back fill in 6** horizontal lifts <br />Labor & Material: $2,505. <br />^ (8) Andorra Junipers (alternates: Webber or Blue Chip) 760.i <br />^ Landscape rock and film (2 layers of 6 mil) <br />^ Steel Edging (1/8" X 4" painted) <br />Labor 8i Material: 1,820.1 <br />^ Boulder and splash rock spillways 750.1 <br />v: <br />Pft)foiNdrK3liy larying cornrnofcksl Olid roNdofiftol oonvfturiiHes Nrico 1974
The URL can be used to link to this page
Your browser does not support the video tag.