My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2002 Council Packet
Orono
>
City Council
>
2002
>
10-14-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:18:24 AM
Creation date
2/9/2023 9:50:00 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r I • <br />staff RccoiaaieBdatioa <br />Our .'ccommendation is that the Council discusses the concept of possible property acquisition for <br />stormwateqwnding purposes in order to provide water quality treatment for the stormwater drairuige <br />for the 13-acre area in Navarre that currently flows into Crystal Bay near the western end of Crystal <br />Bay Road. We are recommending that the most logical property to consider acquisition of would <br />be the property located at 3445 Crystal Bay Road with the vacant house. This is an opportune time <br />to discuss this topic as the house is currently vacant and is in poor condition. If a new house is ever <br />built on this property, it would become prohibitively expensive for the City to acquire this property <br />plus it would be an extremely difficult political decision to force homeowners out of their new <br />house. The adjoining property owners have both expressed a favorable opinion of a stormwater pond <br />in this area. <br />We are also recommending approval of the project to install a pipe and swale to reduce the erosion <br />and flooding problems in this area. This project would not preclude any future ponding project on <br />the property located at 3445 Crystal Bay Road. A project to complete stor.i'water ponding would <br />be a longer term project, and for the property owners to have to wait until i ponding project is <br />completed to have the current erosion and flooding problems corrected is not necessary or fair to the <br />property owners. <br />COUNaL ACTION REQUESTED: <br />Discuss concept of possible property acquisition for stormwater ponding purposes. <br />Accept quotation in the amount of $13,418.12 from Norling’s Lake Minnetonka <br />Landscaping, for completion ofthc drainage project at 3435 Crystal Bay Road. Project to be funded <br />from the Stormwater Utility Fund with the appropriate budget adjustment also approved. <br />P!age4of 4
The URL can be used to link to this page
Your browser does not support the video tag.