My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-23-2002 Council Packet
Orono
>
City Council
>
2002
>
09-23-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:17:54 AM
Creation date
2/9/2023 9:48:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Wyatt <br />Pace 2 Rr. Camp TEKO Orono. MN <br />_________Aufluat 7.2002 <br />Improve the existing trail along the waters edge between the boating dock and <br />the swimming beach. The applicants would like to work with the watershed to fix <br />the existing erosion problems, widen the existing trail to promote a safer walking <br />path, restore the lakeshore and reduce impacts to the lake. They are proposing <br />increasing the width to 6 ’ and installing rip rap along the lakeshore and installing <br />a retaining wall on the uphill side. <br />Minor repairs to existing trails as shown on sheet C2.1, Including the addition of <br />stairs between the Stone Lodge and the bathrooms to make the path less steep. <br />Also, they would like to regrade at the swimming beach and along the trail <br />between the changing tents aruj the beach to fix the existing erosion problems <br />and make these areas safer for the kids. <br />Hydrology <br />We have done some Impervious computations and found that the Improvements stated <br />above will increase the impervious area of the site by approximately 13,700 square feet. <br />We performed rate control calculations to confirm that the change In Impervious area <br />doesn’t Increase the runoff rate. According to Hennepin County Soil Survey the soils at <br />this site are of the Erin Complex, in the hydrologic soil group B. The attached <br />HydroCAD calculations show that the runoff rate hasn’t significantly increased for the 1- <br />year, the 10>year or the 100-year storm event due to the approximate 1.7% increase In <br />Impervious area, the summary table is below. <br />Event Runoff, cfs Runoff, cfs <br />Existing Proposed <br />1-year 1.4 1.4 <br />10-year 15.1 15.1 <br />100-year 33.4 33.4 <br />The weighted curve number is the same since the increase in impervious is negligible in <br />respect to the site area, see attached Hydrocad computation sheets. <br />Water Quality <br />In order to provide water quality treatment for the Increased Impervious area, we are <br />pressing to construct a filter strip. The impervious area Increase is primarily due to the <br />pavilion and the dining hall addition, approximately 0.16 acres. We have excluded the <br />gravel trails from the impervious area calculation since the trails are less than 10 feet <br />wide and have a 5’ pervious strip on either side. These Improvements are near the <br />northwest comer of the site and the dining hall currently drains irrto the existing wetland <br />in the northwest comer of the site. The attached Drainage Area Map shows the area <br />we evaluated to treat the 0.16 acres of increased impervious. The drainage area is 1.6 <br />eSOSUTUER NORTH BUILOWO 810 FIRST AVSNUEr»RTH ISNNEAROUS. MN <br />OFFICE: tiamOOTO FAX 8124824077 mmi
The URL can be used to link to this page
Your browser does not support the video tag.