My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-2002 Council Packet
Orono
>
City Council
>
2002
>
09-09-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 9:50:27 AM
Creation date
2/9/2023 9:48:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />The proposed medical office building at 16,000 s.f. in area rather than 15,000 <br />s.f. remains at a one story design and retains the same architectural styling as <br />the original plan. <br />The building orientation has been reversed so that its front entrance is facing <br />northeast toward Kelley Parkway rather than southwest toward the intersection <br />of Hwy 12 & Old Crystal Bay Road. <br />Applicants have advised the City that they now have a signed purchase agreement <br />to acquire the 2.5 acre Adjacent Parcel to the east, and the Revised Concept Plan <br />indicates the potential for additional parking on that site as well as a shared <br />access to Kelley Parkway. <br />The easterly entrance to Kelley Parkway in the Revised Concept Plan will be a <br />full access shared entrance with the Adjacent Parcel. This was formerly an “in- <br />only ” access point. It is located directly across from the Orono Police driveway <br />as required by the City to eliminate left-turning conflicts for exiting vehicles. <br />The westerly access from Kelley Parkway will be “in-only ” which provides easy <br />access for patient drop-off and pick-up while providing less of a stacking backup <br />conflict for cars exiting onto westbound Kelley Parkway. <br />The easterly parking lots are connected by two “through” corridors to additional <br />parking on the Adjacent Parcel. Based on applicants’ revised submittal C2.1, <br />required parking is 72 stalls, of which 67 are provided on-site and 5 are provided <br />on the adjacent property to the east. Tlie site plan indicates that a total of 15 <br />stalls are proposed on the Adjacent Parcel to serve this site, due to the <br />applicants’ expectation that a total of 83 stalls are likely necessary to adequately <br />serve their intended use of the building. The revised parking layout appears to <br />meet the appropriate engineering and zoning design standards in terms of stall <br />size, driving lane width, etc. <br />The 2.5 acre Adjacent Parcel for which the applicants have a purchase agreement, <br />is similarly guided in the Orono Community Management Plan for commercial <br />office use and is also currently zoned RR-IB. It would be appropriate for this <br />Adjacent Parcel to be rezoned to B-6/PUD concurrently with rezoning of the <br />property. The Adjacent Parcel should be subject to the same development <br />standards as the property, as they will be guided and zoned identically. <br />Page 2 of 12
The URL can be used to link to this page
Your browser does not support the video tag.