My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-26-2002 Council Packet
Orono
>
City Council
>
2002
>
08-26-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:17:27 AM
Creation date
2/9/2023 9:47:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1. <br />D. Wetland Impacts <br />While the City recognizes that the wetland impacts depicted in the <br />Conceptual Wetland Impact Plan are for the most part necessary <br />to allow a reasonable development of the site, applicant shall <br />demonstrate to the satisfaction of the City Council that all <br />requirements of the Mirmehaha Creek Watershed District as <br />administrator of the WCA regulations on Orono’s behalf, are <br />complied with. <br />Orono’s 26* wetland setback requirement (Zoning Code Section <br />lO.SS, Subd. 8) which disallows filling, grading, dredging, <br />excavation, hardcover, temporary or permanent structures, <br />obstructions, septic systems, wells or other construction, is in effect <br />on the site. Final grading and site plans shall indicate those <br />locations where grading or filling within the 26* setback is <br />necessary to accomplish the Plan. While filling of the 26' setback <br />area will be allowed as necessary to accomplish the plan, no <br />encroachment of buildings, retaining walls or other constructed <br />features will be approved. <br />E. Grading, Erosion Control <br />Erosion control shall adhere to "Best Management Practices for <br />Protecting Water Quality in Urban Areas". All erosion controls <br />as required by the City and the MCWD shall be in place prior to <br />commencing excavation on the site. All such erosion control <br />measures shall be maintained in working order until the site is <br />revegetated. <br />The construction limits shall be clearly marked with adequate <br />fencing to prevent any construction damage or disturbance of any <br />trees and vegetation outside of the construction limits area. <br />Developer shall identify trees to be preserved on site, shall mark <br />them on a site plan, and shall take extraordinary measures such <br />as fencing, signage, etc. to ensure they are not disturbed. <br />Page 16 of 21 <br />i <br />iNifaiiitiMaaMMiaMi
The URL can be used to link to this page
Your browser does not support the video tag.