My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-26-2002 Council Packet
Orono
>
City Council
>
2002
>
08-26-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:17:27 AM
Creation date
2/9/2023 9:47:39 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
boundaries of property and 5' along the internal lot lines, per the attached <br />drawing. <br />C. Flowage and Conservation easements shall be granted over the wetlands on <br />Lot 1 and Lot 2 and shall be shown as “drainage easements ” on the final plat <br />drawing. <br />D. Naming of plat. <br />2. Legal documents required: <br />Title opinion addressed to the City. All owners, mortgage holders or others <br />with property interest indicated therein shall sign the plat and all other <br />documents affected by such interest. <br />b. The applicant must provide certified copies of all recorded easements <br />currently affecting the property. <br />c. Subdivider shall execute a Conservation and Flowage Easement over all areas <br />shown as “drainage easement ” on the plat. <br />3. Fees to be paid. <br />a. Final plat fee = $200.00 <br />b. Legal review and filing fees for subdivision and associated documents <br />$200 00 <br />c.♦Park Dedication Fee: amount shall be determined as soon as City Assessor <br />has placed a fair market value on the undeveloped land at the time of <br />preliminary plat approval. The subdivider shall be advised as soon as <br />Assessor's report has been filed with City. Park dedication fee shall be based <br />on 8% of the fair market value of the land not to exceed $5,550 per lot. <br />d.Stormwater and Drainage Trunk Fee: amount is determined by number of <br />acres being developed (7.75) X $2,700 per acre = $20.925 . <br />Page 4 of 7 <br />t'nTm ■niTfnnii iru in i n ivii frtnuttn n ■m
The URL can be used to link to this page
Your browser does not support the video tag.