Laserfiche WebLink
STROO ROSENE ANDERLIK W 6516361311 02/08/02 11:52 0 :02/02 N0:99‘ <br />HtmmlngJIohnR <br />WMtbrook, Chad B <br />Friday. Fabruary 08.200211:15 AM <br />Hamming, John R <br />Orono Lift Stailona <br />Hi John. Hera are my commenta on the lift atation control panel review for the City of <br />Orono. <br />^ 1. I noticed that there ia a comment for 2-foot lega and akirt. The akirt ahould alao <br />0^ have louvera. <br />2. X aee on Page 1 of 2 of the drawinga a numbered table atating what each device ia. <br />Will there be lamacold. or other nameplatea provided for each of theae itema? <br />There ia no motor aeal fail indication. Doea the City want thla alarm? <br />There ia net motor ovtrtemp indication. Doea the City want thla alarm? <br />S. There ia no back up control to the MPB duplex controller. The City may want to add <br />;^a relay backup which locka out the MPB controller and etarta the pumpa on High level. If <br />j the high level float ia reached, it may be becauae the main controller haa failed. A <br />reiet pushbutton could be added to reset the controls. A timer may be added to delay the <br />lag pump from starting at the same time as the lead pump. <br />6. Confirm generator receptacle number. Receptacle shown does not indicate it is <br />"reverse service". <br />y.yX <br />0-^ <br />! C