f <br />REQUEST FOR COUNCIL ACTION <br />Coi JMr.lL meeting <br />MAY t 3 20(12 <br />CITY OF ORONO <br />DATE: May 13,2002 <br />10ITEM NO. <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed: Agenda Section: <br />Public Sers’ices’s Directors Report <br />Item Description: Lift Station Pump Control Panel Replacements <br />The 2001 Sewer Capital Improvement Budget included $30,000 each for three lift stations to replace <br />the pumps and control panels. These three stations were constructed in 1971 as part of the Saga <br />Hill/Forest Lake Area Sanitary Sewer Project. Approval for the pump replacements has already been <br />obtained. The total cost for the pump replacements is $40,000, so there is $50,000 left in the budget <br />for the control panel replacements. Since this money was included in the 2001 budget, a budget <br />adjustment to the 2002 Sewer Capital Improvement Budget will be required for purchase of these <br />panels in 2002. <br />We obtained quotations for the purchase and installation of new control panels in these lift stations, <br />and the Council previously accepted the quotation from Electric Pump of Minneapolis. These new <br />panels will be large enough for the future installation of SCADA equipment. Upon engineering <br />review of the shop drawings submitted by the control panel supplier, it was noted that several <br />necessar>' items were not included in the panels. This is because the quotation request prepared by <br />public works stafTdid not clearly specify that these items were required. The revised quotation <br />below increases the cost per panel by $850 to account for these additional items that have been added <br />to the panels. These additional costs do not change the results of the quotation solicitation process. <br />Lift Station #16 $11,710 <br />Lift Station #17 $11,710 <br />Lift Station #19 $11,710 <br />Revised Quotation $12,560 <br />Revised Quotation $12,560 <br />Revised Quotation $12,560 <br />Total Cost $35,130 Revised Cost $37,680 <br />COUNCIL ACTION REQUESTED: <br />Motion to accept quotation from Electric Pump, Minneapolis Minnesota for lift station control panel <br />replacements in the amount of $37,680. <br />Motion to approve a budget adjustment to the 2002 Sewer Fund Capital Improvement Budget in the <br />amount of $37,680 for the purchase and installation of three replacement lift station control panels. <br />i