My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-13-2002 Council Packet
Orono
>
City Council
>
2002
>
05-13-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 10:14:44 AM
Creation date
2/9/2023 9:25:42 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I " H <br />CniiMrn MEETING <br />MAY 1 3 aXB <br />REQUEST FOR COUNCIL ACTION CITYOFORONO <br />DATE: May 13,2002 <br />ITEM NO.: ^ <br />Department Approval: <br />Nine Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed: <br />f/4 <br />Agenda Section: <br />Public Services Director's Report <br />Item Description: Quotations for Highwood Road Storm Sewer Project <br />We are in the process of soliciting quotations for a project to install a new storm sewer pipe to <br />replace an existing pipe that is failing. This existing pipe drains an area adjacent to Highwood Road <br />to Lake Minnetonka. This failing pipe has been causing flooding problems in several yards and <br />threatening a home basement. The proposed project is to directional bore a new pipe from the <br />ponding area adjacent to Highwood Road along a 20 foot wide platted alley to Lake Minnetonka. <br />A project plan is included for your review. The pipe will be directionally bored, so no excavation <br />will be required for pipe installation under the road and down the hill. Excavation will be required <br />near the lakeshore to install a manhole and a short section of pipe. Riprap will be installed at the <br />lakeshore. In order to protect the hill side, the contractor will be required to barge in the necessary <br />materials and equipment across the lake to complete the work near the lakeshore. The estimated cost <br />for this project is $40,000, and the project will be funded from the storm water utility fund. <br />The deadline for the receipt of quotations is 10:00 a m. on Monday, May 13*. We w ill review the <br />quotations on Monday and request Council approval to select the quotation from the lowest <br />responsible contractor. <br />COUNCIL ACTION REQUESTED: <br />Motion to accept the quotation from in the amount of S for completion <br />of the Highwood Road Storm Sewer project. <br />Motion to approve a budget adjustment for the year 2002 Stormwater Utility Fund Capital <br />Improvement Budget in the amount of $______for the Highwood Road Storm Sewer project. <br />rm-11 r-T T* <br />i
The URL can be used to link to this page
Your browser does not support the video tag.