My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-14-2002 Council Packet
Orono
>
City Council
>
2002
>
01-14-2002 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 9:15:36 AM
Creation date
2/9/2023 9:14:01 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
completed. This plan will be at I-foot contour intervals and will include a cross-section showing <br />elevations and slopes. The location of any temporary access points, control structures, BMPs, and fixed <br />photo reference points will also be identified. The final grading plan will be a result of the information <br />collected and analyzed for tasks one through six. An initial (conceptual) grading plan has been designed, <br />but will require signiflcant refinement. <br />Task 8 - Wetland Delineation and Field Review <br />A final delineation of the remainder of the property and field rev iew will be completed within the <br />growing season. Adjustments to the mitigation area and final acceptance of the report will be completed <br />at this time. Contractor will be given direction to modify the mitigation site accordingly once this task <br />has been completed. <br />Task 9 - Final Document <br />A final copy of the mitigation plan containing all of the information gathered in the above tasks <br />will be written, bound, and submitted to the proper agencies for review and acceptance. This <br />will be an on-going document that will be completed in conjunction with the above tasks. <br />Costs <br />The following table is an estimate of the remaining hours required to complete the above tasks. These <br />hours are based on what is currently known about the site and from past experiences in wetland <br />mitigation design. The costs provided do not reflect time requested by regulatory agencies for field <br />review or development of possible remediation plans. Additional costs for unexpected developments will <br />be provided upon request. <br />Taskl Hours Cost <br />Determine Goal of Replacement - Task Complete <br />Task 2 <br />Location of Wetland Replacement - Task Complete <br />Task 3 <br />Determination of Hydrology — Hours Remaining <br />Scientist 2 140 <br />Senior Scientist 2 200 <br />Hydrologist 7 532 <br />Task 4 <br />Soils - Hours Remaining <br />Scientist 1 70 <br />Senior Scientist 3 300 <br />Technician 2 180
The URL can be used to link to this page
Your browser does not support the video tag.