A-LONGL0003.00 <br />Fire StatioB Wctlaad Mitigatioii <br />Proposed Scope of Work and Timeline <br />Wetland Mitigation <br />As a requirement of the U.S. Army Corps of Engineers (USAGE), the Minnesota Wetland Conservation <br />Act (WCA), and Minnehaha Creek Watershed District (MCWD), wetland impacts must be compensated <br />for through the creation or restoration of new wetland. For the construction of the fire station, 8,480 <br />square feet of wetland will be filled. Applying the 2:1 replacement requirement, a minimum of 16,960 <br />square feet of replacement credit must be created or claimed. This will be accomplished through the <br />creation of new wetland, upland buffer, and possible public value credit for storm water control ponds. <br />All of these options will be done on site. Final evaluation and acceptance of credits for replacement will <br />be at the discretion of the MCWD and the USAGE as both agencies have jurisdiction over the wetlands <br />impacted by the project. <br />The MCWD requires ty^ie for type wetland replacement. The existing wetland is a forested floodplain <br />(Type I A) and will require that the mitigation site be designed as a wooded swamp with a scrub shrub <br />understory. The location of the site will be along a drainage ditch with the main source of hydrology <br />being seasonal flooding. These wetlands are difficult to design and develop, and will require <br />considerably more time to design than a typical emergent mitigation site. Design and creation of wetland <br />mitigation sites is a collaborative effort of many disciplines and requires close coordination between <br />engineers, hydrologists, biologists, and ultimately the contractor responsible for construction. <br />Described below is a draft scope and budget describing the tasks and estimated costs required to <br />complete a mitigation site from initial site location to final grading and seeding. Hours have been <br />summarized to reflect time spent for each task and personnel classification. A draft timeline has also <br />been included to document the key dates when deliverable products are due. The plan is to submit a <br />draft proposal to the MCWD by the end of January to receive preliminary approval. <br />Please note that this draft proposal only includes the hours required to complete a mitigation plan. <br />Project costs, including estimated cost for excavation, soil replacement, seeding, tree planting, etc., are <br />not included with this scope. These costs will be estimated through the planning process and included as <br />a final project cost at the time the mitigation plan is deemed complete. <br />Wetland replacement also has additional requirements, including a five-year monitoring period and the <br />implementation of a vegetation management plan. A separate scope and budget has been included for <br />the monitoring requirement. The vegetation management plan will be drafted with the final mitigation <br />design, but will commence with annual monitoring. Construction oversight has been incorporated with <br />the monitoring plan. <br />Task 1 - Determine Goal of Replacement <br />The design of wetlands begins with a determination of how much wetland needs to be replaced, the <br />function and values that need to be replaced, site geometry, and topographical setting. This task has been <br />completed with the submittal of the initial wetland permit application.