Laserfiche WebLink
f <br />C <br />Application Complete: <br />60 Day Deadline: <br />Extension: <br />4/1/03 <br />5/30/03 <br />7/29/03 <br />--------------- <br />JUN 9 2003 <br />CITY Ur <br />REQUEST FOR COUNCIL ACTION <br />Department Approval: <br />Name: Jennifer Chaput <br />Title: City Planner <br />DATE: May 27,2003 <br />ITEM NO. <br />Agenda Section: Zoning <br />Item Description://03-288S Cerda and Ed Toth <br />1280/1290 Spruce Place <br />Variances <br />Exhibits: <br />A Resolution <br />B <br />C <br />Staff Report and exhibits of 5/19/03 Planning Commission meeting <br />Staff Report and e.\hibits of 4/21/03 Planning Commission meeting <br />Application Summary: <br />The applicant requests the following variances to permit construction of a new residence on the <br />property: <br />1. lot area of 18,553 s.f. (0.43 acres) where 43,560 s.f. (1 acre) is required; <br />2. a lot width of 99 ’ at the OHWL and the 75’ setback from the OHWL where 140 ’ is <br />required; <br />3. Ill s.f (1.47%) hardcover within the 0 to 75’ lakeshore setback zone where none is <br />permitted; <br />4. 3,303 s.f (30%) hardcover within the 75’ to 250’ lakeshore setback zone where 2,753 <br />s.f (25%) is permitted; <br />5. grading and filling wthin 75’ of the OHWL of Lake Minnetonka where no grading nor <br />filling is permitted. <br />This application was tabled at the April 21, 2003 Planning Commission meeting to allow the <br />applicants to reduce hardcover in the 75’ to 250’ setback zone and sttuctural coverage on the lot. A <br />recommendation on this application was made at the May 19,2003 Planning Commission meeting. <br />Pertinent Code Sections: <br />1. Section 10.24, Subd. 5 (B): Minimum Requirements: The following minimum <br />requirements for the LR-IB District shall be observed: lot area 1 acre; lot width 140 feet. <br />(Request: To allow a lot area of 18,553 s.f (0.43 acres) where 43,560 s.f (1 acre) is required <br />and to allow a lot width of 99 ’ at the 75’ setback from the OHWL and at the OHWL where <br />140' is required). <br />2. Section 10.22, Subd. 2 and Section 10.56, Subd. 16 (LKO & (2): Hardcover within 75*: <br />Within 75’ of the shoreline there shall be no excavating, filling, hardcover, temporary or <br />permanent structures. (Request: To allow 111 s.f (1.47%) hardcover within the 0 to 75’ <br />lake«hore setback zone where none is permitted). <br />3. Se.'tion 10.22, Subd. 2 and SecUon 10.56, Subd. 16 (LX2): Hardcover within 75* to 250 ’: <br />Between 75 feet and 250 feet of the OHWL there shall be no greater than 25% hardcover. <br />(Request: To permit 3,303 s.f (30%) hardcover within the 75’ to 250’ lakeshore setback <br />J