My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-09-2003 Council Packet
Orono
>
City Council
>
2003
>
06-09-2003 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2023 4:13:58 PM
Creation date
2/8/2023 1:26:59 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bonestroo <br />Rosene <br />Anderljk& <br />Associates <br />Engineers & Architects <br />April 7, 2003 <br />Ms. Wendy Bottenberg <br />Planner <br />City of Orono <br />Post Office Box 66 <br />Cry'Stal Bay, Minnesota 5S323 <br />Re: Lakeview Town Office Park <br />File No. 139-03-000 <br />Plat No. 03-2888 <br />Bonetiroo. Ro»«ne. Anderhk snd AstociAlvs. Inc. it «n AfhrmAiivc Acf«on/Cqu«l Opportunity Employer <br />end Employee Owned J <br />Prtncip4lt. Otto G Bonestroo P€ • M«rrvin I Sorv<»l.«. P€ • Glenn R Cook P£ • Robert G Scnuojchi Pf <br />Jerry A Bourdon, P£ • M.wk A H<«mon. PC <br />Senior Contultentf; Robert W Rotene. PE • Joseph C Anderlili. PE • Richard E Turrser. PE • S usao M Eberim. C PA <br />Attociete Princlpalt Keith a Gordon. PE ■ Robert R Plefferle. PE • Rich*«rj w foster PE • OAvid O LoskotA PE • <br />Micn<«el T R.iu:m«inn. PE • Ted K field PE • Kenneth P Arsderson. PE • M.srk R Rolfs PE • O.ivid A Bonestroo MBA • <br />Sidney P Willi.imson. PE . L S • Agnes M Rirsg, MBA* Allan Rick Schmidt PE • Thomas W Peterson. PE • <br />James R MaMnd PE • Miles 8 Jensen PE • I Phillip Gravel HI P£ • Daniel J Edgerton, P£ • Ismael Marlines. PC • <br />Thomas A Syfko PE • Sheldon J Jorsnson • Dale A Grove PE • Thomas A Rouihar PE • Robert J Oevery PE <br />Offices; St P«hjI St Cloud. Rochester and Wiiimar. MN • Milwaukee Wl • Chicago. It <br />Vl^bfite; WWW bonestroo com <br />Dear Wendy. <br />We have reviewed the preliminary plans for the proposed Lakeview Town Office Park. The site is located just <br />west of Orono Senior Housing site in the northwest quadrant of Wayzata Boulevard (T.H. 12) and North <br />Brow n Road. We have the following comments with regards to engineering matters: <br />I. <br />2. <br />3. <br />4. <br />5. <br />Traffic: The proposed access road grades on the east and w est sides of the site exceed 12%. This is <br />exceptionally steep and wc recommend street grades be revised not to exceed 8%. Stop signs should be <br />installed tor vehicles eastbound from the subject site at the intersection of the access road from T.H. 12. <br />Streets and parking areas should be constructed to the City’s commercial/industrial street section as per <br />City Standard Detail STR-7. All streets and parking areas shall have B6I8 concrete curb and gutter. <br />Grading: We recommend that parking lot grades not exceed 4%. The proposed removal of the existing <br />timber retaining wall along the west side of the site is on the adjacent property. Easements will be <br />required for the retaining wall removal and the construction of the new retaining wall. All retaining walls <br />over 4-feet in height require an engineered design and details. All silt fence must be in place prior to any <br />grading activity. The applicant should provide an overall site plan showing building elevations so the City <br />evaluate building l«eigl>ts arid ai^pearar.ee fivun the nort'n and souui. <br />Drainage: A drainage area map and storm sewer calculations should be provided for our review. Plans <br />should be submitted to the Minnehaha Creek Watershed District for their review. The applicant should <br />provide evidence that the downstream storm sewer has the capacity to serve the new proposed use. <br />I'ttlitics: The proposed sanitar>' sewer design appears acceptable. The City should be notified \.hen the <br />sewer and water connections will be made to the City facilities. Water main connections shall be by <br />cutting in a tec, no wet taps are permitted. Final plans should include sanitary sewer, storm sewer and <br />water mam plan and profile view’s. 1 lydrants should be located at all dead end lines and at all high points. <br />Fa»eiiu'iils: New utility easements will need to be provided for all constructed water main, sanitaiy and <br />^toml sewer. Drainage easeinenl.s should be provided across any existing or proposed drainage ways. <br />Drainage and utility easements should be provided 10-feet wide along all lot lines. A final plat should be <br />submitted for review. <br />23J5 West Highway 36 • St. Paul, MN S5I13 • 651-636-4600 ■ Fax: 651*636*1311
The URL can be used to link to this page
Your browser does not support the video tag.