Laserfiche WebLink
f <br />Improvement Original Study Altomative <br />Design <br />Orono <br />Participation <br />Racommandad Schadula <br />1.Water main interconnect (8-inch) just <br />west of Virginia Avenue <br />$47,000 $47,000 Yes Spring/Summer 2003 <br />2.Water main interconnect (8-inch) at <br />Brimhall Avenue <br />$73,000 $73,000 Yes <br />1 <br />Spring/Summer 2003 <br />3.12-inch water main crossing of West <br />Wayzata Boulevard west of West <br />Industrial Boulevard in Orono <br />Orono expense <br />based on <br />redevelopment <br />south of West <br />Wayzata <br />Boulevard. <br />UnknoxNn Total As needed for <br />development in Orono. <br />4.Rehabilitation of capacity of Well No. <br />2 to 1,000 gpm‘" <br />$10,000 $70,000 Y^P’2006 <br />5. ^New pump, motor and electrical for <br />Well No. 2 to increase flow to 1,000 <br />gpm <br />0 $107,000 Yes 2006 <br />6.Rehabilitation of wellhouse $224,000 $224,000 No 2006 <br />7.Trunk water main extension in the <br />Glenmoor Area <br />$117,000 $117,000 No 2006 <br />8.Construct new 400.000 gallon <br />elevated tank <br />$915,000 0 No N/A <br />9.Demolition of existing water tower $50,000 0 No N/A <br />10.Rehabilitation of existing water tower 0 $270,000 No Fall, 2003 <br />Total Cost of Improvements $1,436,000 $908,000 <br />Regular well maintenance likely needed in a few years at an approximate cost of $ 10.000. <br />Unless Orono constructs a second well.