Laserfiche WebLink
CITYOFORONO <br />North tong Lake Sewer Extension <br />Preliminary Cost Estimate <br />BRA File No. 139-03-125 <br />Preliminary Cost Estimate <br />V Hi".; . '-'T5N9S?’ <br />EST. <br />_____________!IEM______________UNIT QUANTITY <br />2" HOPE SDR 11, directional bore <br />Sanitary service, incl. curb stop <br />Flushing station connection <br />Air release manhole <br />Connect to existing manhole <br />Seeding incl. topsoil, mulch, fert. <br />Estimated Construction Cost <br />+5% Contingencies <br />— A <br />-if <br />UNIT <br />PRICE <br />LF 1800 $17.00 <br />EA 5 2,500.00 <br />EA 2 2,500.00 <br />EA 1 8,000.00 <br />EA 1 1.000.00 <br />AC 1 3,000.00 <br />•>■20% Legal, Engineering and Administration <br />+5% Capitalized Interest and Bonding <br />Total Estimated Cost <br />Ptdkrinui Cost Estimate (1-23-03)j(to <br />EST. <br />COST <br />• III <br />$30,600 <br />12,500 <br />5. <br />8. <br />1,000 <br />3, <br />III <br />•II • <br />$60,100 <br />3,005 <br />$63,105 <br />12,621 <br />$75,726 <br />3.786 <br />$79,512 <br />•’'r