Laserfiche WebLink
4' . <br />I <br />The original Contract Sum was $ 1.981,000.00 <br />Net change by previously authorized Change Orders $ 108,562.86 <br />The Contract Sum prior to this Change Order was $ 2,089,562.86 <br />The Contract Sum wHI be increased by this change order in the amount of $ 13,214.50 <br />The new Contract Sum including this Change Order wili be $ 2,102,777.36 <br />The Contract time will be increased by 0 days. <br />The date of Substantial Completion as of the date of this Change Order is therefore January <br />7.2003 <br />NOTE: This summary does not reflect changes In the Contract Sum, Contract Time or Guaranteed Maximum Price which <br />have been authorized by Construction Change Directive. <br />Authorized: <br />ARCHITECT_______________ <br />Boarman Kroos Vogel Group. Inc. <br />Address <br />222 N. 2nd Stre^. <br />Minneapolis. MW55401 <br />BY <br />CONTRACTOR OWNER <br />Cltvof Orono <br />P.O. Box 66 <br />Crystal Bay. MN 55323 <br />BY <br />Rochon Corp. City of Lono Lake <br />Suite 120,3650 Annapolis Lane North 1964 Park Ave. <br />Plymouth. MN 55447 Long Lake. MN 55356 <br />T5STT <br />AIA document 0701 * CHANGE ORDER * 1067 EDITION * AIA • COPYRIGHT 1967 * <br />THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., N.W., WASHINGTON. O.C. 20006-5292 <br />WARNING: Unicswd plwlocopyino HolMw U.8. C(x>y»1ghl Mw snd >« subiect 1o MqN pro—cuSon. ThMdocunwnl wet <l»c troniqlly produced viMhpwnisilon <br />at 6w AIA end cermoi be reprodu^ mMmu I vlole6on unM tw dele of e «plr»6on rwled below.