Laserfiche WebLink
chan W <br />ORDER <br />OWNER <br />ARCHITECT <br />CONTRACTOR <br />FIELD <br />OTHER <br />AIA DOCUMENT G701 <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES: CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS <br />COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA DOCUMENT MAY BE MADE BY USING AIA <br />DOCUMENT D401. <br />PROJECT: <br />(Name, address) <br />Long Lake Fire Station <br />340 Willow Drive <br />Long Lake. MN <br />CHANGE ORDER NO.:THREE (3 ) <br />f <br />DATE:November 26,2002 <br />TO CONTRACTOR:Rochon Corporation <br />Suite 120 <br />ARCHITECT’S PROJECT »: 1515.01 <br />3650 Annapolis Lane North <br />Plymouth, MN 55447 <br />CONTRACT DATE; <br />CONTRACT FOR: <br />The contract is changed as follows: <br />1. Misc. cost item U15. Cut bottom of roof screen columns as per ASI # 6. <br />(Architect Requested) <br />2. Misc. cost item # 16.Change to Hose reel mounts in apparatus bay. <br />(Architect Requested) <br />3. Misc. cost item #17. Cut angle at roof screen. <br />(Architect Requested) <br />4. Misc. cost item # 21. Adjust Pr # 21 total listed in CO # 2. <br />(Owner Requested) <br />5. Misc. cost item # 24. Add gyp. bd. above ceiling in the plenum space. <br />(Architect Requested) <br />6. Misc. cost item # 25. Deduct for Watts RPZ Model 957 OSY <br />(Mech. Engineer Requested) <br />7. Proposal Request # 10. Change training room light Fixtures <br />(Owner Requested) <br />8. Proposal Request # 12. Change turn out lockers <br />(Architect Requested) <br />9. Proposal Request# 13. Modified metal window sill condition <br />(Architect Requested) <br />10. Proposal Request # 18. Hardware revisions at vestibule doors. <br />(Architect Requested) <br />11. Proposal Request #19. (item # 2). Provide added De-stratification fens <br />(Mech. & Elect. Engineer Requested) <br />12. Proposal Request # 20. Change SCBA sink requirements, <br />(Mech. Engr. Requested) <br />Total of items # 1 • # 12, including Contractor's overhead & profit <br />Q:\PROAI S15-0 l\BUSVCO-3.DOC <br />Complete Construction <br />$ 414.00 <br />$ 57.00 <br />$ 414.00 <br />$ 268.00 <br />$ 3.612.50 <br />(- $ 500.00 ) <br />$ 3.053.00 <br />(-$2,000.00) <br />$ 2,127.00 <br />$ 318.00 <br />$ 1,785.00 <br />$ 3.666.00 <br />$ 13.214.50