Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />MONDAY. JULY 19,2004 <br />6:00 o'clock p.m. <br />(S. M4-M26 DsvM PoariKMl TmAsw* Rood, Vorteace, MIk Hcortof- CoattaiMd) <br />b. Lake set bock variance to allow a deck setback of 39’ where 75* is required and 49* <br />currently exisu (house). <br />c. Bluff impact zone encroachment of 25'. <br />Cunis referred to the 1992 variance approval for this property resulted in hardcover removal. Since <br />that time, the existing path to the lake had been upgraded to a 4' stone paver path with stairs, which <br />provide a safer path down the steep slope. She indicated staff determined that the hardcover <br />calculated in 1992 did not include this existing path and now makes it appear that the 2004 hardcover <br />calculation is 2% higher than in 1992. The path hardcover accounts for the additional 2%, not an <br />iiKrease in the size of the deck. Curtis stated staff found that due to the existing location of the home <br />there may be a hardship to allow the deck to be rebuilt. Additionally, the deck provides a safe "yard” <br />area for the applicants to enjoy the lakeside of their property from the home. <br />Curtis recommended approval of the after-the-fact lake setback and hardcover variances as the <br />location of the existing home and replacement nearly in-kind of a pre-existing deteriorated non- <br />conforming deck constihile hardship in this situation. <br />Mr. Sequira pointed out the proposed deck poction to the south eliminates the 18 ’’ drop to existing <br />pavers at the doorway that exists the dining area. He stated ihcir goal is to create a level area os it is <br />close to the bluff to make it safer when stepping from the house. Chair Rahn asked Mr. Sequira if the <br />submitted hardcover calculations reflect this deck pinion. Mr. Sequira indicated that the hardcover <br />calculations do include this deck area, and referred to Exhibit E. for clarification. <br />There followed a discussion that clarified exactly what hardcover calculations had been approved in <br />1992 and what was included or excluded from the 2004 hardcover calculations. Chair Rahn <br />summarized that the rebuilding of the existing deck has no further encroachment into the 0-75' <br />setback. <br />Chair Rahn asked for public comments. There were none. <br />Jurgens asked for further clarification of the proposed hardcover calculations, referring to Page 3 of <br />the June 15.2004 Staff Report. Chair Rahn requested the record to indicate that the hardcover <br />calculation increase from 11.1% to l3.2°/b results from the allowed path/access to the lake and not <br />fix>m any additional deck hardcovei. <br />Bremer moved, Kempf sccMded, to rccomoseod approval of Appikatioo #04-3926, David <br />Pomlje, 801 Tookawa Rood, graotlof after-the-fact lake setback aod 0-75* hardcov er variaocct <br />In or^r to rcconstrnct (and reconfigure) a deck, consisting of the fallowing: <br />a. Hardcover wilhhi 0-75* of 11% or 3,404Js.f. <br />b. Lake set back variance to allow a deck setback of 39* where 75* is required and 49* <br />currently exists (hanse). <br />c. Bluir impact zone encroachment of 29*. <br />VOTE: Ayes 7, Nays 0. <br />Page4ofl3